Development of Risk-Based Inspection and Maintenance procedures for an oil refinery

Abstract The management of failure analysis has a strategic importance within a refinery from the organizational, engineering and economic point of view. The determination of an algorithm, that allows a methodical and as far as possible automatic approach to management of failure data, can make substantial improvements in the organization of work and in the decision-making processes. A panel of expert, made up of academicians and refinery operators, was formed in order to develop a Risk-Based Inspection and Maintenance (RBI&M) procedure. RBI&M procedure developed comprises six modules: identification of the scope, functional analysis, risk assessment, risk evaluation, operation selection and planning, J-factor computation and operation realization. Taking into consideration historical data regarding Near Accidents, Operating Drawbacks, Occupational and Environmental Accidents occurred in refinery over the last years the panel of expert defined a risk matrix in order to evaluate the risk associated to critical events and maintenance activities. Five probability classes and five severity categories, that take into account four impact categories (Health and Safety, Environmental, Economic and Reputation), have been defined. This paper reports the application of the RBI&M method to two specific stages in the maintenance activities of the refinery, i.e. the oil refinery turnaround and work orders management. The panel of expert developed heuristic methods in order to apply RBI&M procedure to the two cases allowing the refinery to minimize the overall risk taking into consideration the limits in term of time and budget (in turnaround case) and of human resources (in the management of work orders). The results have highlighted a clear improvement in the indices which measure the quality of maintenance.

[1]  W. E. Vesely,et al.  PRA importance measures for maintenance prioritization applications , 1994 .

[2]  Tim Bedford Assessing the Impact of Preventive Maintenance Based on Censored Data , 2004 .

[3]  Prasanta Kumar Dey,et al.  A risk‐based model for inspection and maintenance of cross‐country petroleum pipeline , 2001 .

[4]  Wenbin Wang,et al.  A modelling procedure to optimize component safety inspection over a finite time horizon , 1997 .

[5]  Faisal Khan,et al.  Risk-Based Inspection and Maintenance (RBIM): Multi-Attribute Decision-Making with Aggregative Risk Analysis , 2004 .

[6]  Philip A. Scarf,et al.  A fully subjective approach to modelling inspection maintenance , 2003, Eur. J. Oper. Res..

[7]  Rose Baker,et al.  Estimating the delay-time distribution of faults in repairable machinery from failure data , 1991 .

[8]  Nir Keren,et al.  Operational risk assessment of chemical industries by exploiting accident databases , 2007 .

[9]  Aarnout Brombacher,et al.  Safety lifecycle management. A flowchart presentation of the IEC 61508 overall safety lifecycle model , 1999 .

[10]  Faisal I Khan,et al.  Risk-based maintenance of ethylene oxide production facilities. , 2004, Journal of hazardous materials.

[11]  A. H. Christer,et al.  Modelling maintenance practice of production plant using the delay-time concept , 1995 .

[12]  Faisal Khan,et al.  Development of a risk-based maintenance (RBM) strategy for a power-generating plant , 2005 .

[13]  Ali Siadat,et al.  Dynamic risk management unveil productivity improvements , 2009 .

[14]  J. Moubray Reliability-Centered Maintenance , 1991 .

[15]  Michael Todinov,et al.  Setting reliability requirements based on minimum failure‐free operating periods , 2004 .

[16]  Uday Kumar Maintenance strategies for mechanized and automated mining systems : a reliability and risk analysis based approach , 1998 .

[17]  Murray Turoff,et al.  The Delphi Method: Techniques and Applications , 1976 .

[18]  Kenneth R. Balkey,et al.  ASME RISK-BASED INSERVICE INSPECTION AND TESTING : AN OUTLOOK TO THE FUTURE , 1998 .

[19]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[20]  M. M. Baron,et al.  Designing risk-management strategies for critical engineering systems , 1999 .

[21]  Marcello Braglia,et al.  Monte Carlo simulation approach for a modified FMECA in a power plant , 2000 .

[22]  John A. Harnly Risk based prioritization of maintenance repair work , 1998 .

[23]  Peter W. Glynn,et al.  Dynamic modeling of the tradeoff between productivity and safety in critical engineering systems , 2004, Reliab. Eng. Syst. Saf..