공장건축물의 배치특성에 따른 공단지역 계획 방향에 관한 연구
暂无分享,去创建一个
This study is the result that analyze architectural planning side and characteristic of arrangement of factory building in Industrial Complex Area. The result is as follow. (1) The division of block and land is divided by super block, and is disadvantageous to arrange because slenderness ration of land is much at process that divide. (2) It is needed land division of suitable scale by thing by special quality of location. (3) Prudent attention is required so that do not get into very much slenderness ratioes at atomization process of land at industrial estate plan.