Relationally integrated value networks (RIVANS) for total facilities management (TFM)

Purpose A case is made for developing “Relationally Integrated Value Networks for Total Facilities Management” (RIVANS-TFM) by synergistically connecting significant stakeholders of the project management (PM) and facilities management (FM) phases to deliver substantially better value for the end users of built infrastructure. The paper aims to discuss these issues. Design/methodology/approach A structured questionnaire survey enabled identification of typically significant stakeholders in the PM and FM phases. In total, 14 key stakeholders were identified through t-test analysis in this Sri Lankan study. Semi-structured interviews unveiled relationships among the aforementioned stakeholders and the findings were used to develop the “required” RIVANS-TFM, as well as the “existing” RIVANS-TFM, using the UCINET social network analysis software package. Social network theory of relationships was applied to analyze the networks in terms of “Structural Holes” or missing links and “Brokerage Potentials.” Findings Structural holes analysis highlighted the existing setup to be more vulnerable to missing links than the “required”/targeted setup. Furthermore, brokerage potentials analysis revealed that owners, project managers, facility managers, maintenance engineers, main contractors, designers, principal consultants, and other specialist consultants can act as “brokers” to bridge the gaps or minimize structural holes, thereby uplifting and reinforcing the existing network to deliver better performance and value in TFM. Originality/value By revealing existing and required levels of integration of each stakeholder in RIVANS-TFM, clients are provided a great opportunity to identify the stakeholders who should be engaged more, or less – in order to best achieve clients’ long-term aspirations and project objectives. Furthermore, the findings also indicate appropriate levels of stakeholder relationships to target, in order to maintain efficient flows of information, material and services in the supply chains while enhancing TFM life-cycle values.

[1]  Mohamed A. El-Haram,et al.  The role of the facility manager in new procurement routes , 2002 .

[2]  M. Langbert,et al.  Continuous improvement in the history of human resource management , 2002 .

[3]  Karen Manley,et al.  PARTNERING AND ALLIANCING ON ROAD PROJECTS IN AUSTRALIA AND INTERNATIONALLY , 2002 .

[4]  D. Kuratko,et al.  Developing an Intrapreneurial Assessment Instrument for an Effective Corporate Entrepreneurial Environment , 1990 .

[5]  I. O. Aje,et al.  Assessment of success factors for joint venture construction projects in Nigeria , 2012 .

[6]  Nayanthara De Silva Promoting the facilities management profession in the project development phase of high-rise buildings in Sri Lanka , 2011 .

[7]  C. Prell,et al.  Stakeholder Analysis and Social Network Analysis in Natural Resource Management , 2009, Society & Natural Resources.

[8]  Patrick T.I. Lam,et al.  A sustainable framework of “green” specification for construction in Hong Kong , 2011 .

[9]  M. Kumaraswamy,et al.  Reinforcing relationships for resilience – by embedding end-user ‘people’ in public–private partnerships , 2015 .

[10]  Per Erik Eriksson,et al.  Effects of cooperative procurement procedures on construction project performance: A conceptual framework , 2011 .

[11]  Mohan M. Kumaraswamy,et al.  Building integrated project and asset management teams for sustainable built infrastructure development , 2014 .

[12]  Stanley Wasserman,et al.  Social Network Analysis: Methods and Applications , 1994 .

[13]  Per Anker Jensen,et al.  The Facilities Management Value Map: a conceptual framework , 2010 .

[14]  Joseph S. Sherif,et al.  Human resources in an enriched environment of business intelligence , 2012, Kybernetes.

[15]  M.Y.L. Chew,et al.  A neural network approach to assessing building façade maintainability in the tropics , 2004 .

[16]  Jay Yang,et al.  An empirical test of causal relationships of factors affecting ICT adoption for building project management : an Indian SME case study , 2010 .

[17]  Ronggui Ding,et al.  A Social Network Theory of Stakeholders in China’s Project Governance , 2011 .

[18]  Stephen Emmitt,et al.  Design Management for Architects , 2007 .

[19]  J. Hughes The impact of the Business Expansion Scheme on the supply of privately‐rented housing , 1995 .

[20]  Steven B. Andrews,et al.  Structural Holes: The Social Structure of Competition , 1995, The SAGE Encyclopedia of Research Design.

[21]  Timo Ala-Risku,et al.  Life cycle costing: a review of published case studies , 2008 .

[22]  Gj Ger Maas,et al.  A social capital perspective to innovation management in construction , 2009 .

[23]  Hans Voordijk,et al.  The use of interorganisational ict in construction projects : a critical perspective , 2010 .

[24]  Sui Pheng Low,et al.  Business continuity management in large construction companies in Singapore , 2010 .

[25]  Nayanthara De Silva,et al.  Risk factors affecting building maintenance under tropical conditions , 2012 .

[26]  Seyed‐Mahmoud Aghazadeh,et al.  The future of human resource management , 2003 .

[27]  Mohan M. Kumaraswamy,et al.  Building “relationally integrated value networks” (RIVANS) , 2011 .

[28]  Marya L. Doerfel,et al.  Building Interorganizational Relationships That Build Nations , 2003 .

[29]  Andrew R.J. Dainty,et al.  Construction supply chain integration: an elusive goal? , 2005 .

[30]  Mohan M. Kumaraswamy,et al.  Pursuing “relational integration” and “overall value” through “RIVANS” , 2010 .

[31]  Jonna Järveläinen,et al.  Information security and business continuity management in interorganizational IT relationships , 2012, Inf. Manag. Comput. Secur..

[32]  G. Ofori Greening the construction supply chain in Singapore , 2000 .

[33]  Paul Chinowsky,et al.  Social Network Model of Construction , 2008 .

[34]  Mohan M. Kumaraswamy,et al.  Strategies for integrating design and construction and operations and maintenance supply chains in Singapore , 2014 .

[35]  Martin Loosemore,et al.  Structural holes in hospital organisations , 2013 .

[36]  Thomas Y. Choi,et al.  TRIADS IN SERVICES OUTSOURCING: BRIDGE, BRIDGE DECAY AND BRIDGE TRANSFER , 2009 .

[37]  Kakoli Bandyopadhyay,et al.  Managing technology risks in the healthcare sector: disaster recovery and business continuity planning , 2000 .

[38]  José Antonio Cruz-Ledesma,et al.  Modelling, Design and Robust Control of a Remotely Operated Underwater Vehicle , 2014 .

[39]  Raja R. A. Issa,et al.  Design for maintenance accessibility using BIM tools , 2014 .

[40]  X. Xue,et al.  Stakeholder management in construction : an empirical study to address research gaps in previous studies , 2011 .

[41]  S. Hertz Supply chain myopia and overlapping supply chains , 2006 .

[42]  Ekambaram Palaneeswaran,et al.  Empowering collaborative decisions in complex construction project scenarios , 2004 .