WITHDRAWN: A case-study of critical success factors for construction and demolition waste management: the pearl river delta region of china.
暂无分享,去创建一个
[1] F Andreola,et al. Glass-ceramics obtained by the recycling of end of life cathode ray tubes glasses. , 2005, Waste management.
[2] Vivian W. Y Tam,et al. Economic comparison of concrete recycling : a case study approach , 2008 .
[3] Nilay Cosgun,et al. A study conducted to reduce construction waste generation in Turkey , 2007 .
[4] Vivian W Y Tam,et al. On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.
[5] George Ofori,et al. Building waste assessment score: design-based tool , 2004 .
[6] Vivian W. Y Tam,et al. Towards adoption of prefabrication in construction , 2007 .
[7] R T Eikelboom,et al. The building materials decree: an example of a Dutch regulation based on the potential impact of materials on the environment. , 2001, Waste management.
[8] Vivian W. Y Tam,et al. Waste reduction through incentives: a case study , 2008 .
[9] Chi Sun Poon,et al. Management of construction waste in public housing projects in Hong Kong , 2004 .
[10] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[11] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .
[12] Weisheng Lu,et al. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. , 2011, Waste management.
[13] Weisheng Lu,et al. Critical Success Factors for Competitiveness of Contractors: China Study , 2008 .
[14] Charles J. Kibert,et al. Strategies for successful construction and demolition waste recycling operations , 1997 .
[15] Clodagh McGrath,et al. Waste minimisation in practice , 2001 .
[16] Qiping Shen,et al. Critical Success Factors for Value Management Studies in Construction , 2003 .
[17] Wang Jia-yuan. Construction waste management model based on system dynamics , 2009 .
[18] Zhu Jiao-lan. Investigation on the On-site Construction Waste Reduction Measures , 2010 .
[19] Evia O.W. Wong,et al. Promoting sustainable construction waste management in Hong Kong , 2004 .
[20] C. Poon. Reducing construction waste. , 2007, Waste management.
[21] Chi Sun Poon,et al. Minimizing demolition wastes in Hong Kong public housing projects , 2004 .
[22] J.L. Hao,et al. A simulation model using system dynamic method for construction and demolition waste management in Hong Kong , 2007 .
[23] Peter E.D. Love,et al. AN ANALYSIS OF FACTORS INFLUENCING WASTE MINIMISATION AND USE OF RECYCLED MATERIALS FOR THE CONSTRUCTION OF RESIDENTIAL BUILDINGS , 2003 .
[24] Chi Sun Poon,et al. Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .
[25] Chi Sun Poon,et al. Reducing building waste at construction sites in Hong Kong , 2004 .
[26] Vivian W. Y Tam,et al. Evaluations of existing waste recycling methods: A Hong Kong study , 2006 .
[27] Yat Hung Chiang,et al. Critical Success Factors for Bond Financing of Construction Projects in Asia , 2011 .
[28] Vassilios Karavezyris. Report: Treatment of commercial, construction and demolition waste in North Rhine-Westphalia: policy-making and operation options , 2007, Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA.
[29] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.
[30] Chi Sun Poon,et al. The use of recycled aggregate in concrete in Hong Kong , 2007 .
[31] Weisheng Lu,et al. Critical success factors for on-site sorting of construction waste: A china study , 2010 .
[32] Gracia Rodríguez,et al. The contribution of environmental management systems to the management of construction and demolition waste: The case of the Autonomous Community of Madrid (Spain) , 2007 .