Plug and Play Process Control Applied to a District Heating System

Abstract The general ideas within plug and play process control (P 3 C) are to initialize and reconfigure control systems just by plug and play. In this paper these ideas are applied to a district heating pressure control problem. First of all this serves as a concrete example of P 3 C, secondly some of the first techniques developed in the project to solve the problems in P 3 C are presented. These are in the area of incremental modelling and control and they make it possible to “plug” in a new sensor and actuator and make it “play” automatically.