Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea

Construction delay caused considerable losses to project parties. Avoiding construction delays is important to save costs for project stakeholders. The main objective of this paper is to identify major causes of construction delays of apartment construction projects in Vietnam. Sixteen causes of delay were identified through a questionnaire survey of 166 professionals. Factor analysis was employed to categorize these causes. The results of the survey revealed the main causes of delay of apartment projects in Vietnam are: (1) owner's and contractor'S financial difficulties; (2) lack of experienced contractors; (3) late delivery of materials; (4) late construction site handover; (5) owner's late payments for completed works; (6) low bid prices; (7) inappropriate construction method; and (8) defective works and unnecessary reworks. Factor analysis uncovered that causes of delay can be grouped under five categories labeled the five INs: incompetence, ineffectiveness, inadequateness, inapplicableness and inconceivableness. Comparative analysis between the Vietnam construction industry (VCI) and the Korea construction industry (KCI) has been performed to infer valuable lessons for researchers and practitioners in the VCI and the KCI. Comparative analysis indicated that main causes of delay in the VCI somewhat differ from main causes of delay in the KCI. However, "contractor'S financial difficulties", "late construction site handover", "unnecessary rework", "incapable designers", "site clearance difficulties" are common causes of delay in the VCI as well as the KCI. The findings of this research can be used as a guideline to overcome problems in the VCI as well as in other construction industries. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in Korea.

[1]  David Arditi,et al.  FACTORS THAT AFFECT PROCESS QUALITY IN THE LIFE CYCLE OF BUILDING PROJECTS , 1998 .

[2]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[3]  Subhash Sharma Applied multivariate techniques , 1995 .

[4]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[5]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[6]  William F. Maloney,et al.  Motivational Implications of Construction Work , 1986 .

[7]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[8]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[9]  Stephen O. Ogunlana,et al.  Large construction projects in developing countries: a case study from Vietnam , 2004 .

[10]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[11]  H. Randolph Thomas,et al.  Quantitative Effects of Construction Changes on Labor Productivity , 1995 .

[12]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[13]  Richard L. Tucker,et al.  Multiskilled Labor Utilization Strategies in Construction , 1998 .

[14]  H. Kaiser,et al.  Little Jiffy, Mark Iv , 1974 .

[15]  F. C. Harris,et al.  Delays on Large Construction Projects , 1986 .

[16]  Serji N. Amirkhanian,et al.  Expert System for Equipment Selection for Earth-Moving Operations , 1992 .

[17]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[18]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[19]  Francis Hartman,et al.  More-Stable Owner-Contractor Relationships , 1996 .

[20]  Keith Bradsher Vietnam’s Roaring Economy Is Set for the World Stage , 2006 .

[21]  J. K. Yates Construction Decision Support System for Delay Analysis , 1993 .

[22]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[23]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[24]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[25]  Anthony D. Songer,et al.  PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .

[26]  W. M. Ng,et al.  SIMULATION MODELING AND MANAGEMENT OF LARGE BASEMENT CONSTRUCTION PROJECT , 1998 .

[27]  Alan D. Russell Computerized Daily Site Reporting , 1993 .

[28]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[29]  Osama E. K. Daoud The Architect/Engineer’s Role in Rehabilitation Work , 1997 .

[30]  Ahmad Anuar Othman,et al.  Factors influencing the construction time of civil engineering projects in Malaysia , 2006 .