Pavement Management Systems

University of Mississippi University, MS, U.S.A. 18.1 Historical Overview of PMS 18-2 Societal Perspectives † Evolution of PMS Concept 18.2 Network Level vs. Project-Level PMS Functions 18-6 Key Components of PMS † Legislative Level Issues † Administrative Level Issues † Technical Level Issues † Network Level vs. Project-Level Pavement Management

[1]  Waheed Uddin Air Quality Analysis Considering Mobile and Aviation Sources and Monitoring using Remote Sensing Tunable Laser Technology , 2003 .

[2]  Ezio Giuriani,et al.  Role of Stirrups and Residual Tensile Strength of Cracked Concrete on Bond , 1991 .

[3]  Kamal Golabi,et al.  A Statewide Pavement Management System , 1982 .

[4]  F T Park Traffic data collection and analysis , 1980 .

[5]  T F Fwa,et al.  FUZZY LOGIC TECHNIQUE FOR PAVEMENT CONDITION RATING AND MAINTENANCE-NEEDS ASSESSMENT , 1998 .

[6]  John P Zaniewski,et al.  PROBABILISTIC LIFE-CYCLE COST ANALYSIS FOR PAVEMENT MANAGEMENT , 2002 .

[7]  Waheed Uddin,et al.  FINITE ELEMENT SIMULATION OF PAVEMENT DISCONTINUITIES AND DYNAMIC LOAD RESPONSE , 1994 .

[8]  Kanok Boriboonsomsin,et al.  A 3D-FE SIMULATION STUDY OF THE EFFECTS OF NONLINEAR MATERIAL PROPERTIES ON PAVEMENT STRUCTURAL RESPONSE ANALYSIS AND DESIGN , 2003 .

[9]  G W Flintsch PAVEMENT MANAGEMENT ENHANCEMENT USING SOFT COMPUTING , 2003 .

[10]  Waheed Uddin,et al.  SERVICE LIFE ANALYSIS FOR MANAGING ROAD PAVEMENTS IN MEXICO , 1998 .

[11]  Waheed Uddin Application of Remote Sensing Tunable Laser Technology for Measuring Transportation Related Air Pollution , 2002 .

[12]  Weng Tat Chan,et al.  ROAD-MAINTENANCE PLANNING USING GENETIC ALGORITHMS.. , 1994 .

[13]  W R Hudson,et al.  COMPARISON OF METHODS AND EQUIPMENT TO CONDUCT PAVEMENT DISTRESS SURVEYS , 1988 .

[14]  Waheed Uddin,et al.  MAINTENANCE PLANNING METHODOLOGY FOR STATEWIDE PAVEMENT MANAGEMENT , 1994 .

[15]  Waheed Uddin IN SITU EVALUATION OF SEASONAL VARIABILITY OF SUBGRADE MODULUS USING DCP AND FWD TESTS , 2002 .

[16]  D. Bray Nondestructive Evaluation , 2018 .

[17]  Mohamed Y. Shahin,et al.  Pavement Maintenance Management for Roads and Streets Using the PAVER system , 1990 .

[18]  Waheed Uddin LIFE CYCLE ANALYSIS FOR INVESTMENT DECISION-MAKING TO REVIVE ANCIENT SILK ROAD AND ENHANCE THE ECONOMIES OF CENTRAL ASIAN COUNTRIES , 2002 .

[19]  Friedrich W Jung,et al.  ELASTIC LAYER ANALYSIS RELATED TO PERFORMANCE IN FLEXIBLE PAVEMENT DESIGN , 1974 .

[20]  R Haas GOOD TECHNICAL FOUNDATIONS ARE ESSENTIAL FOR SUCCESSFUL PAVEMENT MANAGEMENT , 2003 .

[21]  Ralph Haas,et al.  NATIONAL ECONOMIC DEVELOPMENT AND PROSPERITY RELATED TO PAVED ROAD INFRASTRUCTURE , 1993 .

[22]  Wdh Woodward,et al.  DEVELOPMENT OF EARLY LIFE SKID RESISTANCE FOR HIGH STONE CONTENT ASPHALT MIXES , 2002 .

[23]  W R Hudson,et al.  A METHODOLOGY FOR LIFE-CYCLE COST ANALYSIS OF PAVEMENTS USING MICROCOMPUTER. SIXTH INTERNATIONAL CONFERENCE, STRUCTURAL DESIGN OF ASPHALT PAVEMENTS, VOLUME I, PROCEEDINGS, UNIVERSITY OF MICHIGAN, JULY 13-17, 1987, ANN ARBOR, MICHIGAN , 1987 .

[24]  Ralph Haas,et al.  Pavement Management Systems , 1982 .

[25]  A T Papagiannakis,et al.  ACCOUNTING FOR AGENCY AND USER COSTS IN PAVEMENT LIFE-CYCLE COST ANALYSIS , 2003 .

[26]  John P Zaniewski,et al.  Modern Pavement Management , 1994 .

[27]  F H Scrivner,et al.  A SYSTEMS APPROACH APPLIED TO PAVEMENT DESIGN AND RESEARCH , 1970 .

[28]  F L Roberts,et al.  Modeling permanent deformation of the Louisiana ALF crumb rubber modified test sections , 2003 .

[29]  Wade D. Cook,et al.  Recent developments and potential future directions in ranking and optimization procedures for pavement management , 1987 .

[30]  Waheed Uddin,et al.  INTEGRATION OF REMOTE SENSING AND GEOSPATIAL TECHNOLOGIES FOR MANAGING TRANSPORTATION INFRASTRUCTURE ASSETS , 2001 .

[31]  W R Hudson,et al.  WHAT ARE THE TRUE COSTS AND BENEFITS OF PAVEMENT MANAGEMENT , 1994 .

[32]  Gaetano Licitra,et al.  PERFORMANCE DEGRADATION OF POROUS ASPHALT PAVEMENTS , 2003 .

[33]  W R Hudson,et al.  IMPROVED METHODS AND EQUIPMENT TO CONDUCT PAVEMENT DISTRESS SURVEYS. FINAL REPORT , 1987 .

[34]  Luís Picado-Santos,et al.  A DETERMINISTIC OPTIMIZATION MODEL PROPOSED FOR THE LISBON'S PMS , 2003 .

[35]  Nii O. Attoh-Okine Artificial intelligence and mathematical methods in pavement and geomechanical systems : proceedings of the international workshop on artificial intelli[n]gence and mathematical methods in pavement and geomecahnical systems, Florida/USA/5-6 November, 1998 , 1998 .

[36]  Weng Tat Chan,et al.  PRIORITY RATING OF HIGHWAY MAINTENANCE NEEDS BY NEURAL NETWORKS , 1993 .

[37]  Norman R. Draper,et al.  Applied regression analysis (2. ed.) , 1981, Wiley series in probability and mathematical statistics.

[38]  Weng Tat Chan,et al.  ROAD-MAINTENANCE PLANNING USING GENETIC ALGORITHMS. II: ANALYSIS , 1994 .

[39]  W R Hudson,et al.  Smoothness acceptance testing and specifications for flexible pavements , 1987 .

[40]  Wiley D Cunagin,et al.  PORTABLE SENSORS AND EQUIPMENT FOR TRAFFIC DATA COLLECTION , 1986 .

[41]  N O Attoh-Okine Computational intelligence applications in pavement and geomechanical systems: proceedings of the 2nd International Workshop on Artificial Intelligence and Mathematical Methods in Pavement and Geomechanical Systems, Newark, Delaware, USA, 11-12 August 2000 , 2000 .