Cost Estimation in Engineer-to-Order Manufacturing

Abstract In Engineer-to-Order (ETO) manufacturing the price of products must be defined during early stages of product design and during the bidding process, thus an overestimation of product development (PD) costs may lead to the loss of orders and an underestimation causes a profit loss. What many ETO systems have in common is that the products have to be developed based on different customer requirements so that each order usually results in a new variant. Furthermore, many customer requirement change-requests may arise in different phases of the PD, which is to be considered properly. Thus it is utmost important for ETO systems to have an accurate cost estimation in first stages of the product design and to be able to determine the cost of customer requirement changes in different phases of PD. This paper aims to present a cost estimation methodology as well as a cost estimation model, which estimate the cost of products by relative comparison of the attributes of new product variants with the attributes of standard product variants. In addition, as a necessity in ETO manufacturing, the cost calculation of customer requirement changes in different phases of PD is integrated in the presented method.

[1]  Ali Siadat,et al.  Cost Estimation and Conceptual Process Planning , 2007 .

[2]  Jürgen Bode,et al.  Neural networks for cost estimation: Simulations and pilot application , 2000 .

[3]  Jörg Becker,et al.  Supporting the Design Process with Neural Networks , 1993 .

[4]  Daschievici Luiza,et al.  Modeling and estimation of the product time and cost in manufacturing system-market relationship , 2014 .

[5]  Mauricio Camargo,et al.  APPLICATION OF THE PARAMETRIC COST ESTIMATION IN THE TEXTILE SUPPLY CHAIN , 2003 .

[6]  Hans-Joachim Franke,et al.  Variantenmanagement in der Einzel- und Kleinserienfertigung , 2000 .

[7]  Rajkumar Roy,et al.  Design requirements change and cost impact analysis in airplane structures , 2007 .

[8]  Günther Schuh,et al.  Grundlagen der Produktionsplanung und -steuerung , 2012 .

[9]  Bernd E. Hirsch Cim in Der Unikatfertigung Und-Montage , 1992 .

[10]  Jörg Becker Entwurfs- und konstruktionsbegleitende Kalkulation , 1990 .

[11]  D. McDougall,et al.  Transfer of power : problems of the passage to self-government , 1962 .

[12]  Crispin Hales,et al.  Engineering design: a systematic approach , 1989 .

[13]  Nikolaus Blümlein Function-based cost estimation for service robot prototypes in early design phases , 2014 .

[14]  G. Sames,et al.  Aachener PPS-Modell : das morphologische Merkmalsschema , 1998 .

[15]  E. Gutenberg Grundlagen der Betriebswirtschaftslehre , 1969 .

[16]  Yiliu Tu,et al.  One-of-a-Kind Production , 2011 .

[17]  Jian S. Dai,et al.  Product Cost Estimation: Technique Classification and Methodology Review , 2006 .

[18]  C. Ou-Yang,et al.  Developing an integrated framework for feature-based early manufacturing cost estimation , 1997 .

[19]  Rajkumar Roy,et al.  Cost engineering: why, what and how? , 2003 .

[20]  Marin D. Guenov,et al.  A methodology for modelling manufacturing costs at conceptual design , 1998 .

[21]  Karl Kurbel Produktionsplanung und -steuerung im Enterprise Resource Planning und Supply Chain Management , 2005 .

[22]  Jerry Y. H. Fuh,et al.  A neural network approach for early cost estimation of packaging products , 1998 .

[23]  Gandjar Kiswanto,et al.  METHOD AND MODEL DEVELOPMENT FOR MANUFACTURING COST ESTIMATION DURING THE EARLY DESIGN PHASE RELATED TO THE COMPLEXITY OF THE MACHINING PROCESSES , 2014 .

[24]  Y. A. Sekercioglu,et al.  Review of hardware cost estimation methods, models and tools applied to early phases of space mission planning , 2012 .

[25]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[26]  Andrew Stellman,et al.  Applied software project management , 2005 .

[27]  Patrick Ademola Oduguwa Cost impact analysis for requirements management , 2006 .

[28]  Mauricio Torres Methodology to create cost estimation models for engineer-to-order operations , 2011 .