Formalising the Repair of Schedules Through Knowledge Acquisition
暂无分享,去创建一个
[1] Stephen F. Smith,et al. An Integrated Framework for Generating and Revising Factory Schedules , 1990 .
[2] Norman M. Sadeh,et al. Resource allocation in distributed factory scheduling , 1991, IEEE Expert.
[3] Kenneth N. McKay,et al. Schedulers & Planners: What and How Can We Learn From Them , 1995 .
[4] Leslie D. Interrante,et al. Active Rescheduling and Collaboration in Dynamic Manufacturing Systems , 1994 .
[5] Mark S. Fox,et al. Resource configuration and allocation-a case study of constrained heuristic search , 1992, IEEE Expert.
[6] Robin Lane,et al. Solving problems in production scheduling , 1995 .
[7] Basilio Bona,et al. Some experiences in the application of AI in manufacturing and control , 1990 .
[8] David Little,et al. Automated assembly scheduling: A review , 1994 .
[9] Patrick Prosser,et al. A constraint maintenance system for the distributed resource allocation problem , 1992 .
[10] George Rzevski,et al. Artificial Intelligence in Manufacturing , 1989 .