An effective ant colony optimization algorithm for multi-objective job-shop scheduling with equal-size lot-splitting
暂无分享,去创建一个
[1] Jinwoo Park,et al. A batch splitting method for a job shop scheduling problem in an MRP environment , 1999 .
[2] Shahram Jadid,et al. Economic-environmental energy and reserve scheduling of smart distribution systems: A multiobjective mathematical programming approach , 2014 .
[3] Álvaro Gomes,et al. A multi-objective genetic approach to domestic load scheduling in an energy management system , 2014 .
[4] Thomas Stützle,et al. Ant Colony Optimization , 2009, EMO.
[5] Marc Gravel,et al. Solving real car sequencing problems with ant colony optimization , 2006, Eur. J. Oper. Res..
[6] Rong-Hwa Huang,et al. Ant colony system for job shop scheduling with time windows , 2008 .
[7] Minghao Yin,et al. A novel objective function for job-shop scheduling problem with fuzzy processing time and fuzzy due date using differential evolution algorithm , 2011 .
[8] Stéphane Dauzère-Pérès,et al. An iterative procedure for lot streaming in job-shop scheduling , 1993 .
[9] H. Nagasawa,et al. Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties , 1993 .
[10] F.T.S. Chan,et al. Lot Streaming Technique in Job-Shop Environment , 2005, Proceedings of the 2005 IEEE International Symposium on, Mediterrean Conference on Control and Automation Intelligent Control, 2005..
[11] Michael Sampels,et al. Ant colony optimization for FOP shop scheduling: a case study on different pheromone representations , 2002, Proceedings of the 2002 Congress on Evolutionary Computation. CEC'02 (Cat. No.02TH8600).
[12] Lin Lin,et al. Multiobjective evolutionary algorithm for manufacturing scheduling problems: state-of-the-art survey , 2014, J. Intell. Manuf..
[13] Pan Li,et al. Multi-Objective Optimal Energy Consumption Scheduling in Smart Grids , 2013, IEEE Transactions on Smart Grid.
[14] Kamran S. Moghaddam. Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming , 2013 .
[15] Ching-Jong Liao,et al. Ant colony optimization combined with taboo search for the job shop scheduling problem , 2008, Comput. Oper. Res..
[16] John W. Sutherland,et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .
[17] Stéphane Dauzère-Pérès,et al. Lot Streaming in Job-Shop Scheduling , 1997, Oper. Res..
[18] Pedro M. Castro,et al. Scope for industrial applications of production scheduling models and solution methods , 2014, Comput. Chem. Eng..
[19] Chompoonoot Kasemset,et al. A PSO-based procedure for a bi-level multi-objective TOC-based job-shop scheduling problem , 2012 .
[20] Chang Ouk Kim,et al. Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times , 2012 .
[21] Ning-Sheng Wang,et al. An Improved PSO Algorithm for Flexible Job Shop Scheduling with Lot-Splitting , 2009, 2009 International Workshop on Intelligent Systems and Applications.
[22] F.T.S. Chan,et al. Equal size lot streaming to job-shop scheduling problem using genetic algorithms , 2004, Proceedings of the 2004 IEEE International Symposium on Intelligent Control, 2004..
[23] Jian Xiong,et al. Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns , 2013 .
[24] Cheng Wang,et al. Multi-objective Integration of Flexible Collaborative Planning and Fuzzy Flexible Lot-Splitting Scheduling Based on the Pareto Optimal , 2015 .
[25] Clarence H. Martin,et al. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming , 2009 .
[26] Carlos A. Coello Coello,et al. An ant system with steps counter for the job shop scheduling problem , 2007, 2007 IEEE Congress on Evolutionary Computation.
[27] Yin-Yann Chen,et al. A hybrid flowshop scheduling model considering dedicated machines and lot-splitting for the solar cell industry , 2014, Int. J. Syst. Sci..
[28] Rong-Hwa Huang,et al. Overlapping production scheduling planning with multiple objectives--An ant colony approach , 2008 .
[29] R. Wehner,et al. The Ant Odometer: Stepping on Stilts and Stumps , 2006, Science.
[30] Christian Blum,et al. Metaheuristics in combinatorial optimization: Overview and conceptual comparison , 2003, CSUR.
[31] Maurizio Faccio,et al. Lot splitting scheduling procedure for makespan reduction and machine capacity increase in a hybrid flow shop with batch production , 2012 .
[32] Simon Fong,et al. Accelerated Particle Swarm Optimization and Support Vector Machine for Business Optimization and Applications , 2011, NDT.
[33] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[34] David J. Singer,et al. Testing of a spreading mechanism to promote diversity in multi-objective particle swarm optimization , 2015 .
[35] Rong-Hwa Huang,et al. Multi-objective job-shop scheduling with lot-splitting production , 2010 .
[36] Gary L. Ragatz,et al. The impact of lot splitting on due date performance , 1994 .
[37] Marco Dorigo,et al. Ant system: optimization by a colony of cooperating agents , 1996, IEEE Trans. Syst. Man Cybern. Part B.
[38] Sanja Petrovic,et al. Reducing environmental impact of production during a Rolling Blackout policy – A multi-objective schedule optimisation approach , 2015 .
[39] E. Nowicki,et al. A Fast Taboo Search Algorithm for the Job Shop Problem , 1996 .
[40] Manuel López-Ibáñez,et al. Ant colony optimization , 2010, GECCO '10.
[41] Nuno O. Fernandes,et al. Aligning workload control theory and practice: lot splitting and operation overlapping issues , 2016 .
[42] Luca Maria Gambardella,et al. Ant colony system: a cooperative learning approach to the traveling salesman problem , 1997, IEEE Trans. Evol. Comput..
[43] Daniel Oron,et al. A single machine batch scheduling problem with bounded batch size , 2008, Eur. J. Oper. Res..
[44] Fariborz Jolai,et al. A variable neighborhood search for job shop scheduling with set-up times to minimize makespan , 2009, Future Gener. Comput. Syst..
[45] Rong-Hwa Huang,et al. Solving a multi-objective overlapping flow-shop scheduling , 2008 .
[46] Cem Canel,et al. An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system , 2005 .
[47] Min Dai,et al. Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization , 2016, Comput. Ind..
[48] Deming Lei,et al. A genetic algorithm for flexible job shop scheduling with fuzzy processing time , 2010 .
[49] Qun Niu,et al. Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time , 2008, Appl. Math. Comput..
[50] E. Wilson,et al. Journey to the ants: a story of scientific exploration , 1994 .
[51] Marco Dorigo,et al. Optimization, Learning and Natural Algorithms , 1992 .
[52] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[53] Voratas Kachitvichyanukul,et al. Multiple colony ant algorithm for job-shop scheduling problem , 2008 .
[54] Adriana Giret,et al. Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm , 2013 .
[55] Mauro Dell'Amico,et al. Applying tabu search to the job-shop scheduling problem , 1993, Ann. Oper. Res..
[56] J. Carlier,et al. An algorithm for solving the job-shop problem , 1989 .
[57] Jessica O. Matson,et al. An Analysis of Block Stacking with Lot Splitting , 2014 .
[58] Haiyan Wang,et al. A new hybrid parallel algorithm for consistent-sized batch splitting job shop scheduling on alternative machines with forbidden intervals , 2010 .
[59] Vassil Guliashki,et al. A Survey of Solving Approaches for Multiple Objective Flexible Job Shop Scheduling Problems , 2015 .
[60] Shahram Jadid,et al. Multi-objective scheduling of electric vehicles in smart distribution system , 2014 .
[61] Juanjuan Hu,et al. An Improved Ant Colony Optimization for Flexible Job Shop Scheduling Problems , 2011 .
[62] Quanke Pan. OPTIMIZATION METHOD FOR A JOB - SHOP SCHEDULING PROBLEM WITH ALTERNATIVE MACHINES IN THE BATCH PROCESS , 2004 .
[63] Maurizio Faccio,et al. Balancing–sequencing procedure for a mixed model assembly system in case of finite buffer capacity , 2009 .
[64] Chih-Ming Hsu,et al. Benefits of lot splitting in job-shop scheduling , 2004 .
[65] Terence M. Hancock. Effects of Lot‐splitting under Various Routing Strategies , 1991 .
[66] Kenneth R. Baker,et al. Basic Techniques for Lot Streaming , 1993, Oper. Res..
[67] Ye Xu,et al. An effective teaching-learning-based optimization algorithm for the flexible job-shop scheduling problem with fuzzy processing time , 2015, Neurocomputing.