Passenger oriented disruption management in railways : by adapting timetables and rolling stock schedules
暂无分享,去创建一个
[1] Belarmino Adenso-Díaz,et al. On-line timetable re-scheduling in regional train services , 1999 .
[2] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[3] Anita Schöbel,et al. To Wait or Not to Wait - And Who Goes First? Delay Management with Priority Decisions , 2010, Transp. Sci..
[4] Dennis Huisman,et al. Delay Management with Rerouting of Passengers , 2012, Transp. Sci..
[5] Leo G. Kroon,et al. A rolling horizon approach for disruption management of railway rolling stock , 2012, Eur. J. Oper. Res..
[6] François Soumis,et al. Passenger Flow Model for Airline Networks , 2007, Transp. Sci..
[7] Norio Tomii,et al. An optimal delay management algorithm from passengers' viewpoints considering the whole railway network , 2011, J. Rail Transp. Plan. Manag..
[8] Luis Cadarso,et al. Recovery of disruptions in rapid transit networks , 2013 .
[9] Leo G. Kroon,et al. Rescheduling of Railway Rolling Stock with Dynamic Passenger Flows , 2010, Transp. Sci..
[10] Leo G. Kroon,et al. A rolling stock circulation model for combining and splitting of passenger trains , 2006, Eur. J. Oper. Res..