Simulation-based Optimization using Genetic Algorithms for Multi-objective Flexible JSSP
暂无分享,去创建一个
Florin Gheorghe Filip | Nicolae Paraschiv | Elena Simona Nicoară | E. Nicoara | F. Filip | N. Paraschiv
[1] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[2] Sheik Meeran,et al. Deterministic job-shop scheduling: Past, present and future , 1999, Eur. J. Oper. Res..
[3] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[4] Florin Gheorghe Filip,et al. Job shop scheduling optimization in real-time production control , 1983 .
[5] Lawrence Davis,et al. Job Shop Scheduling with Genetic Algorithms , 1985, ICGA.
[6] Florin Gheorghe Filip,et al. Disassembly Line Scheduling with Genetic Algorithms , 2008, Int. J. Comput. Commun. Control.
[7] David H. Wolpert,et al. No free lunch theorems for optimization , 1997, IEEE Trans. Evol. Comput..
[8] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[9] E. Nicoara,et al. Mechanisms to Avoid the Premature Convergence of Genetic Algorithms , 2009 .
[10] Felix T.S. Chan,et al. Flexible job-shop scheduling problem under resource constraints , 2006 .