Coordination of inbound and outbound transportation schedules with the production schedule

We study the coordination of production and shipment schedules for a manufacturer.Both inbound and outbound transportation schedules are considered.The objective is to minimize the sum of inventory holding and transportation costs.Properties of the solution space, lower bounds are developed; a heuristic is proposed for large-size instances. This paper studies the coordination of production and shipment schedules for a single stage in the supply chain. The production scheduling problem at the facility is modeled as belonging to a single process. Jobs that are located at a distant origin are carried to this facility making use of a finite number of capacitated vehicles. These vehicles, which are initially stationed close to the origin, are also used for the return of the jobs upon completion of their processing. In the paper, a model is developed to find the schedules of the facility and the vehicles jointly, allowing for effective utilization of the vehicles both in the inbound and the outbound. The objective of the proposed model is to minimize the sum of transportation costs and inventory holding costs. Issues related to transportation such as travel times, vehicle capacities, and waiting limits are explicitly accounted for. Inventories of the unprocessed and processed jobs at the facility are penalized.The paper contributes to the literature on supply chain scheduling under transportation considerations by modeling a practically motivated problem, proving that it is strongly NP-Hard, and developing an analytical and a numerical investigation for its solution. In particular, properties of the solution space are explored, lower bounds are developed on the optimal costs of the general and the special cases, and a computationally-efficient heuristic is proposed for solving large-size instances. The qualities of the heuristic and the lower bounds are demonstrated over an extensive numerical analysis.

[1]  Alessandro Agnetis,et al.  Coordination of production and interstage batch delivery with outsourced distribution , 2014, Eur. J. Oper. Res..

[2]  Marc E. Posner,et al.  Generating Experimental Data for Computational Testing with Machine Scheduling Applications , 2001, Oper. Res..

[3]  Feng Li,et al.  Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations , 2014 .

[4]  Xiuli Wang,et al.  Machine scheduling with an availability constraint and job delivery coordination , 2007 .

[5]  Zhi-Long Chen,et al.  Order Assignment and Scheduling in a Supply Chain , 2006, Oper. Res..

[6]  Lei Lei,et al.  Integrated batch production and distribution scheduling with limited vehicle capacity , 2015 .

[7]  Chung-Yee Lee,et al.  Machine scheduling with job delivery coordination , 2004, Eur. J. Oper. Res..

[8]  Lixin Tang,et al.  The coordination of transportation and batching scheduling , 2009 .

[9]  Zhiyi Tan,et al.  On the machine scheduling problem with job delivery coordination , 2007, Eur. J. Oper. Res..

[10]  George L. Vairaktarakis,et al.  Integrated Scheduling of Production and Distribution Operations , 2005, Manag. Sci..

[11]  Ihsan Sabuncuoglu,et al.  A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems , 1998 .

[12]  Lixin Tang,et al.  A hybrid two-stage transportation and batch scheduling problem , 2008 .

[13]  Chung-Lun Li,et al.  Machine scheduling with pickup and delivery , 2005 .

[14]  Chris N. Potts,et al.  Supply chain scheduling: Batching and delivery , 2003, Oper. Res..

[15]  Ihsan Sabuncuoglu,et al.  A joint production and transportation planning problem with heterogeneous vehicles , 2014, J. Oper. Res. Soc..

[16]  Douglas J. Thomas,et al.  Coordinated supply chain management , 1996 .

[17]  Chung-Lun Li,et al.  Machine scheduling with deliveries to multiple customer locations , 2005, Eur. J. Oper. Res..

[18]  T. C. Edwin Cheng,et al.  Production scheduling with supply and delivery considerations to minimize the makespan , 2009, Eur. J. Oper. Res..

[19]  Alper Sen,et al.  The US fashion industry: A supply chain review , 2008 .

[20]  Manoj Kumar Tiwari,et al.  New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs , 2010, Eur. J. Oper. Res..

[21]  Ihsan Sabuncuoglu,et al.  A class of joint production and transportation planning problems under different delivery policies , 2013, Oper. Res. Lett..

[22]  Zhi-Long Chen,et al.  Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..

[23]  Milind Dawande,et al.  Supply Chain Scheduling: Distribution Systems , 2006 .

[24]  Chung Yee Lee,et al.  Production and transport logistics scheduling with two transport mode choices , 2005 .