Delays and cost overruns in the construction projects in the Gaza Strip
暂无分享,去创建一个
Mohan M. Kumaraswamy | Adnan Enshassi | Jomah Al-Najjar | M. Kumaraswamy | A. Enshassi | Jomah Al-Najjar
[1] Othman Mohamed,et al. Delay Mitigation in the Malaysian Construction Industry , 2006 .
[2] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[3] Lynn Crawford,et al. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .
[4] Mohan M. Kumaraswamy,et al. Compressing construction durations: lessons learned from Hong Kong building projects , 2002 .
[5] Sameh M. El-Sayegh,et al. Significant factors causing delay in the UAE construction industry , 2006 .
[6] Sebastian Morris,et al. Cost and Time Overruns in Public Sector Projects , 2005 .
[7] Kai Zhu,et al. A Stage-By-Stage Factor Control Framework For Cost Estimation Of Construction Projects , 2004 .
[8] D. Arditi,et al. Reasons for delays in public projects in Turkey , 1985 .
[9] Mohan M. Kumaraswamy,et al. ACCELERATING CONSTRUCTION INDUSTRY DEVELOPMENT , 2006 .
[10] Mohammed Al-Khalil,et al. Important causes of delay in public utility projects in Saudi Arabia , 1999 .
[11] James E. Diekmann,et al. Concurrent delays in construction projects , 1987 .
[12] Gary David Holt,et al. Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .
[13] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[14] N. Kartam,et al. Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .
[15] Mohan M. Kumaraswamy,et al. An evaluation of construction time performance in the building industry , 1996 .
[16] L. T. Wong,et al. Fire services installation related contributors of construction delays , 2006 .
[17] Mohammed Ali Berawi,et al. Conceptual delay mitigation model using a project learning approach in practice , 2008 .
[18] Mohammed Al-Khalil,et al. Delay in public utility projects in Saudi Arabia , 1999 .
[19] A. M. Odeh,et al. Causes of construction delay: traditional contracts , 2002 .
[20] Fazil T. Najafi,et al. Cost and time overruns in highway construction , 2002 .
[21] Nabil I. El-Sawalhi,et al. Contributors to construction delays in Palestine , 2003 .
[22] Murali Sambasivan,et al. Causes and effects of delays in Malaysian construction industry , 2007 .
[23] Denise Polit-O'Hara,et al. Essentials of nursing research : Methods and applications , 1985 .
[24] Daniel C. Okpala,et al. Causes of High Costs of Construction in Nigeria , 1988 .
[25] T. Mezher,et al. Causes of delays in the construction industry in Lebanon , 1998 .
[26] Sherif Ali Mohtady Mohamed,et al. Risk management in building projects in Palestine: contractors’ perspective , 2008 .
[27] G. O. Jagboro,et al. The effects of construction delays on project delivery in Nigerian construction industry , 2002 .
[28] Charles T. Jahren,et al. Predictors of Cost‐Overrun Rates , 1990 .
[29] N. Fisher,et al. An Analysis of the Distribution of Time Variance for Building Projects , 2003 .
[30] Ernawati,et al. The significant factors causing delay of building construction projects in Malaysia , 2007 .
[31] Tommy Y. Lo,et al. Construction Delays in Hong Kong Civil Engineering Projects , 2006 .
[32] Mohan M. Kumaraswamy,et al. Contributors to construction delays , 1998 .
[33] S. Ogunlana,et al. Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .