A methodology for solving single-model, stochastic assembly line balancing problem
暂无分享,去创建一个
[1] Warren H. Thomas,et al. Balancing Stochastic Assembly Lines , 1973 .
[2] Hon-Shiang Lau,et al. A Total Operating Cost Model for Paced Lines with Stochastic Task Times , 1976 .
[3] Hon-Shiang Lau,et al. A Cost-Oriented Approach to Stochastic Line Balancing1 , 1973 .
[4] C. L. Moodie,et al. A HEURISTIC METHOD OF ASSEMBLY LINE BALANCING FOR ASSUMPTIONS OF CONSTANTOR VARIABLE WORK ELEMENT TIMES , 1964 .
[5] Hon-Shiang Lau,et al. An Exploratory Study on Stopping a Paced Line When Incompletions Occur , 1987 .
[6] John C. Carter,et al. A cost-effective approach to stochastic line balancing with off-line repairs , 1984 .
[7] D. Sculli. Short term adjustments to production lines , 1984 .
[8] Prem Vrat,et al. A cost model for optimal mix of balanced stochastic assembly line and the modular assembly system for a customer oriented production system , 1976 .
[9] Erdal Erel. A methodology to solve single-model, stochastic assembly line balancing problem and its extensions , 1987 .
[10] John F. Kottas,et al. A stochastic line balancing procedure , 1981 .
[11] R. W. Sierenberg. An Algorithm for the Line Balancing Problem , 1972 .
[12] A. L. Arcus,et al. COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .
[13] Subhash C. Sarin,et al. Development of cost model for the single-model stochastic assembly line balancing problem , 1990 .
[14] Avraham Shtub,et al. A cost minimization procedure for mixed model production lines with normally distributed task times , 1986 .
[15] George L. Nemhauser,et al. An Algorithm for the Line Balancing Problem , 1964 .
[16] W. E. Wilhelm,et al. On the normality of operation times in small-lot assembly systems: a technical note , 1987 .
[17] Fred N. Silverman,et al. A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages , 1986 .
[18] Avraham Shttjb. The effect of incompletion cost on line balancing with multiple manning of work stations , 1984 .