KM as a Facilitator for Project Performance Through Team Process: Does Information Technology Make a Difference?

This paper empirically investigates a sample of research and development (R&D) projects in Taiwanese high-tech industry with a three-fold purpose. The first objective is to assess the associations among information technology (IT) application, knowledge management (KM), team process (TP), and R&D project performance. The second objective is to determine whether TP may mediate the effect of KM on R&D project performance. The third objective is to examine the moderating role of project characteristics in the relationship between TP and R&D project performance. The structural equation modeling (SEM) approach was used to validate the research model. These analyses suggest that TP may fully mediate the effects of KM on R&D project performance in terms of quality and development success and schedule and cost performance. The results also show that industry sector (IS) and team size (TS) have a moderating effect on the relationship between TP and R&D project performance.

[1]  Hsiu-Fen Lin,et al.  Impact of organizational learning and knowledge management factors on e‐business adoption , 2005 .

[2]  James T. O'Connor,et al.  Project Performance versus Use of Technologies at Project and Phase Levels , 2004 .

[3]  R. Richey,et al.  Exploring knowledge management to organizational performance outcomes in a transitional economy , 2009 .

[4]  James T. O'Connor,et al.  Technology utilization on different sizes of projects and associated impacts on composite project success , 2006 .

[5]  Terry S. Overton,et al.  Estimating Nonresponse Bias in Mail Surveys , 1977 .

[6]  Vachara Peansupap,et al.  Factors affecting ICT diffusion , 2005 .

[7]  Rolph E. Anderson,et al.  Multivariate data analysis (4th ed.): with readings , 1995 .

[8]  Roy Gelbard,et al.  The interactive effect of team dynamics and organizational support on ICT project success , 2009 .

[9]  Françoise Delamare Le Deist,et al.  What Is Competence? , 2005 .

[10]  E. Carayannis Fostering synergies between information technology and managerial and organizational cognition: the role of knowledge management , 1999 .

[11]  D. Eden,et al.  Effects of crew composition on crew performance: Does the whole equal the sum of its parts? , 1985 .

[12]  J. McGrath Social Psychology: A Brief Introduction , 1964 .

[13]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[14]  Patrick Y. K. Chau,et al.  Reexamining a Model for Evaluating Information Center Success Using a Structural Equation Modeling Approach , 1997 .

[15]  Florence Yean Yng Ling,et al.  Key relationship-based determinants of project performance in China , 2006 .

[16]  Gary Klein,et al.  User diversity impact on project performance in an environment with organizational technology learning and management review processes , 2006 .

[17]  Roger M. Schwarz,et al.  The skilled facilitator : practical wisdom for developing effective groups , 1994 .

[18]  Marcia J. Bates,et al.  Information and knowledge: an evolutionary framework for information science , 2005 .

[19]  Ali E. Akgün,et al.  Team Stressors, Management Support, and Project and Process Outcomes in New Product Development Projects , 2007 .

[20]  Elena Revilla,et al.  Information Technology as Knowledge Management Enabler in Product Development - An Empirical Evidence , 2007 .

[21]  M. Bădescu,et al.  The impact of information technologies on firm productivity: Empirical evidence from Spain , 2009 .

[22]  Walter O. Rom,et al.  Analysis of the characteristics of projects in diverse industries , 1998 .

[23]  Binshan Lin,et al.  Effect of team diversity on software project performance , 2007, Ind. Manag. Data Syst..

[24]  Henri Barki,et al.  Interpersonal Conflict and Its Management in Information System Development , 2001, MIS Q..

[25]  Kun Chang Lee,et al.  Erratum to "KMPI: Measuring knowledge management performance" [Information & Management 42 (2005) 469-482] , 2005, Inf. Manag..

[26]  James C. Anderson,et al.  STRUCTURAL EQUATION MODELING IN PRACTICE: A REVIEW AND RECOMMENDED TWO-STEP APPROACH , 1988 .

[27]  E. R. Adagunodo,et al.  Organisational impact of information technology on the banking and insurance sector in Nigeria , 2000 .

[28]  Louis Raymond,et al.  Project management information systems: An empirical study of their impact on project managers and project success , 2008 .

[29]  Gina J. Medsker,et al.  RELATIONS BETWEEN WORK GROUP CHARACTERISTICS AND EFFECTIVENESS: IMPLICATIONS FOR DESIGNING EFFECTIVE WORK GROUPS , 1993 .

[30]  Tridas Mukhopadhyay,et al.  Software Processes and Project Performance , 1995, J. Manag. Inf. Syst..

[31]  Richard P. Bagozzi,et al.  Assessing Construct Validity in Organizational Research , 1991 .

[32]  J. A. Lepine,et al.  Team adaptation and postchange performance: effects of team composition in terms of members' cognitive ability and personality. , 2003, The Journal of applied psychology.

[33]  Nikos Karacapilidis,et al.  Information technology support for the knowledge and social processes of innovation management , 2006 .

[34]  Heeseok Lee,et al.  Knowledge Management Enablers, Processes, and Organizational Performance: An Integrative View and Empirical Examination , 2003, J. Manag. Inf. Syst..

[35]  Xiaotong Li,et al.  Software development risk and project performance measurement: Evidence in Korea , 2007, J. Syst. Softw..

[36]  Chi-Cheng Huang Knowledge sharing and group cohesiveness on performance: An empirical study of technology R&D teams in Taiwan , 2009 .

[37]  Catherine Durnell Cramton,et al.  Relationships among geographic dispersion, team processes, and effectiveness in software development work teams , 2005 .

[38]  Norman E. Lane,et al.  Improving the Measurement of Team Performance: The TARGETs Methodology , 1994 .

[39]  Man Yin Rebecca Yiu,et al.  Measuring knowledge management performance in industrial enterprises : An exploratory study based on an integrated model , 2014 .

[40]  E. Salas,et al.  Toward an understanding of team performance and training. , 1992 .

[41]  J. Hackman A Normative Model of Work Team Effectiveness , 1983 .

[42]  D. L. Gladstein Groups in context: A model of task group effectiveness. , 1984 .

[43]  Birger Hjørland,et al.  The concept of information , 2005, Annu. Rev. Inf. Sci. Technol..

[44]  Gilbert A. Churchill,et al.  Marketing Research: Methodological Foundations , 1976 .

[45]  Eduardo Salas,et al.  The Measurement of Team Process , 1995, Hum. Factors.

[46]  D. A. Kenny,et al.  The moderator-mediator variable distinction in social psychological research: conceptual, strategic, and statistical considerations. , 1986, Journal of personality and social psychology.

[47]  Low Sui Pheng,et al.  Environmental factors and work performance of project managers in the construction industry , 2006 .

[48]  Maria Adenfelt Exploring the performance of transnational projects : Shared knowledge, coordination and communication , 2010 .

[49]  J. Mathieu,et al.  The Influence of Team Knowledge and Formal Plans on Episodic Team Process-Performance Relationships , 2006 .

[50]  Young-Chan Lee,et al.  Capabilities, processes, and performance of knowledge management: A structural approach , 2007 .

[51]  Martin Sexton,et al.  The role of technology transfer in innovation within small construction firms , 2004 .

[52]  F. Ling,et al.  Key project management practices affecting Singaporean firms’ project performance in China , 2009 .

[53]  Jing-Wen Huang,et al.  Strategic human resource practices and innovation performance — The mediating role of knowledge management capacity , 2009 .

[54]  Murray R. Barrick,et al.  Team Structure and Performance: Assessing the Mediating Role of Intrateam Process and the Moderating Role of Task Type , 2000 .

[55]  Dennis J. Devine,et al.  Do Smarter Teams Do Better , 2001 .

[56]  S. Tamer Cavusgil,et al.  Decomposing the effects of market knowledge competence in new product export , 2000 .

[57]  R. Müller,et al.  Matching the project manager’s leadership style to project type , 2007 .

[58]  Robert G. Cooper,et al.  Product Innovation and Technology Strategy , 2000 .

[59]  Chih-Hung Tsai,et al.  An empirical study on the correlation between the knowledge management method and new product development strategy on product performance in Taiwan’s industries , 2005 .

[60]  Sangjae Lee,et al.  Efficiency analysis of controls in EDI applications , 2005, Inf. Manag..

[61]  Min Liu,et al.  Using neural network to predict performance of design-build projects in Singapore , 2004 .

[62]  E. Salas,et al.  Individual Task Proficiency and Team Process Behavior: What's Important for Team Functioning? , 1994 .

[63]  Cathleen Stasz,et al.  Do Employers Need the Skills They Want? Evidence from technical work , 1997 .

[64]  Ilan Oshri,et al.  Social ties, knowledge sharing and successful collaboration in globally distributed system development projects , 2005, Eur. J. Inf. Syst..

[65]  Simon Washington,et al.  Structural equation model of construction contract dispute potential , 2000 .

[66]  Heeseok Lee,et al.  An empirical investigation of KM styles and their effect on corporate performance , 2003, Inf. Manag..

[67]  Yi-Hsing Chang,et al.  KMsharer: an information technology approach to enable knowledge management services , 2008, Int. J. Technol. Manag..

[68]  Elena Revilla,et al.  Information technology as knowledge management enabler in product development , 2013 .

[69]  Yong-Hui Li,et al.  The mediating effect of knowledge management on social interaction and innovation performance , 2009 .