Resourcing for a resilient post-disaster reconstruction environment

Purpose – The purpose of this paper is to understand the resourcing issues that concern the provision of resources required for reconstruction projects after a disaster and to enable them to be integrated into a holistic planning process.Design/methodology/approach – Triangulation methodology is adopted in this paper including both quantitative and qualitative methods. The quantitative approach, namely statistic analysis with the aid of questionnaires and SPSS is employed to identify the key factors affecting resource availability in post‐disaster reconstruction situations. The qualitative semi‐structured interviews and desk reviews of government and media documents are conducted to further interpret outcomes in the questionnaire session.Findings – Based on empirical research, the major finding of the paper is that in order to arrive at a resilient and sustainable built environment after a disaster, resourcing efforts should be made around four components – resourcing facilitator: legislation and policy; ...

[1]  Robert W. McGee An economic and ethical analysis of the Katrina disaster , 2008 .

[2]  E. J. Kaiser,et al.  Natural Hazard Mitigation: Recasting Disaster Policy And Planning , 1998 .

[3]  Michal Lyons,et al.  Building Back Better: The Large-Scale Impact of Small-Scale Approaches to Reconstruction , 2009 .

[4]  Theo Schilderman,et al.  Adapting traditional shelter for disaster mitigation and reconstruction: experiences with community-based approaches , 2004 .

[5]  S. McManus,et al.  Resilience Management: A Framework for Assessing and Improving the Resilience of Organisations , 2007 .

[6]  Jean Vanderbeek,et al.  Enhancing community-based disaster preparedness with information technology. , 2008, Disasters.

[7]  David A. McEntire,et al.  A Comparison of Disaster Paradigms: The Search for a Holistic Policy Guide , 2002 .

[8]  Horst G. Brandes,et al.  Correlation of Aggregate Test Parameters to Hot Mix Asphalt Pavement Performance in Hawaii , 2006 .

[9]  James Olabode Bamidele Rotimi,et al.  Comparison between routine construction and post-disaster reconstruction with case studies from New Zealand , 2006 .

[10]  Dennis J. Osborne,et al.  Reconstruction after the 2004 tsunami: ecological and cultural considerations from case studies , 2006, Landscape and Ecological Engineering.

[11]  PLANNING FOR POST-DISASTER RECONSTRUCTION , 2004 .

[12]  Klaus Krippendorff,et al.  Content Analysis: An Introduction to Its Methodology , 1980 .

[13]  Mark Sullivan,et al.  Integrated recovery management: A new way of looking at a delicate process , 2003 .

[14]  R. Burby Hurricane Katrina and the Paradoxes of Government Disaster Policy: Bringing About Wise Governmental Decisions for Hazardous Areas , 2006 .

[15]  Jacqueline Glass,et al.  Realising a resilient and sustainable built environment: towards a strategic agenda for the United Kingdom. , 2007, Disasters.

[16]  Steven Thompson,et al.  Improving disaster response efforts with decision support systems , 2006 .

[17]  Florian Steinberg,et al.  Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives☆ , 2007 .

[18]  Paul K. Freeman,et al.  Allocation of post-disaster reconstruction financing to housing , 2004 .

[19]  Suahasil Nazara,et al.  Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 , 2007 .

[20]  Thomas J. Campanella,et al.  Planning for Postdisaster Resiliency , 2006 .

[21]  Robin Spence,et al.  Editorial: Managing the risks from natural hazards , 2004 .

[22]  Suzanne Wilkinson,et al.  SUPPLY CHAIN ANALYSIS AND THE SUSTAINABILITY OF POST DISASTER CONSTRUCTION , 2008 .

[23]  T. Jick Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .

[24]  Khaled A El-Rayes,et al.  Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks , 2009 .

[25]  Sisira Jayasuriya,et al.  Reconstruction after a major disaster: Lessons from the post-Tsunami experience in Indonesia, Sri Lanka, and Thailand , 2008 .

[26]  Francis Tekyi Edum-Fotwe,et al.  Developing project management competency: perspectives from the construction industry , 2000 .

[27]  Siambabala Bernard Manyena,et al.  The concept of resilience revisited. , 2006, Disasters.

[28]  P. Berke,et al.  Recovery after disaster: achieving sustainable development, mitigation and equity. , 1993, Disasters.

[29]  M. Lindell,et al.  Preparedness for emergency response: guidelines for the emergency planning process. , 2003, Disasters.

[30]  Ocharo R.M. Kegendo R.S.,et al.  Strengthening Rural Community Bonds as a means of reducing Vulnerability. Geneva, International Federation of the Red Cross and Red Crescent Societies (IFRC) ProVention Consortium , 2003 .

[31]  D. Paton,et al.  Disasters and communities: vulnerability, resilience and preparedness , 2001 .

[32]  Low Sui Pheng,et al.  Environmental factors and work performance of project managers in the construction industry , 2006 .

[33]  Suzanne Wilkinson,et al.  RECONSTRUCTION PROCUREMENT SYSTEMS: THE 2005 MATATA FLOOD RECONSTRUCTION EXPERIENCE , 2005 .

[34]  Suzanne Wilkinson,et al.  Building resilience by focusing on legal and contractual frameworks for disaster reconstruction , 2008 .

[35]  Low Sui Pheng,et al.  Tsunamis: Some pre‐emptive disaster planning and management issues for consideration by the construction industry , 2006 .

[36]  Rachel Roseberry,et al.  A Balancing Act: An assessment of the environmental sustainability of permanent housing constructed by internationa l community in post-disaster Aceh. , 2008 .

[37]  Todd Litman,et al.  Lessons From Katrina and Rita: What Major Disasters Can Teach Transportation Planners , 2006 .

[38]  Derek S. Reiners Lessons of Disaster: Policy Change after Catastrophic Events , 2007, Perspectives on Politics.

[39]  Budy P. Resosudarmo,et al.  The Indian Ocean Tsunami: Economic Impact, Disaster Management, and Lessons , 2005, Asian Economic Papers.