Impact of specification changes on chloride-induced corrosion service life of bridge decks

Abstract A model was developed to determine the time to first repair and to subsequently rehabilitate concrete bridge decks exposed to chloride deicer salts. Said model incorporates the statistical nature of factors affecting the corrosion process. The time to first repair and rehabilitate was predicted for 10 bridge decks built in Virginia between 1981 and 1994. The model was validated using historical service life data for 129 bridge decks built in Virginia between 1968 and 1972. The time for rehabilitation predicted for the newer set of bridge decks was approximately 13 years longer than the normalized time for rehabilitation projected for the older bridge decks. The increase in time for rehabilitation for the newer set of bridge decks was attributed to a reduction in the specified maximum water/cement ratio and increase in clear cover depth. The probabilistic model is shown to be an advancement over the deterministic model currently in use.

[1]  Michael M Sprinkel,et al.  Field Investigation of Corrosion-Protection Performance of Bridge Decks Constructed with Epoxy-Coated Reinforcing Steel in Virginia , 1997 .

[2]  Richard E. Weyers,et al.  FINAL REPORT FIELD PERFORMANCE OF EPOXY-COATED REINFORCING STEEL IN VIRGINIA BRIDGE DECKS , 2000 .

[3]  Jerzy Zemajtis,et al.  Modeling the Time to Corrosion Initiation for Concretes with Mineral Admixtures and/or Corrosion Inhibitors in Chloride-Laden Environments , 1998 .

[4]  Mark G. Stewart,et al.  Structural Safety and Serviceability of Concrete Bridges Subject to Corrosion , 1998 .

[5]  K C Clear EFFECTIVENESS OF EPOXY-COATED REINFORCING STEEL - INTERIM REPORT , 1992 .

[6]  Richard E. Weyers,et al.  CONCRETE BRIDGE PROTECTION AND REHABILITATION: CHEMICAL AND PHYSICAL TECHNIQUES. SERVICE LIFE ESTIMATES , 1993 .

[7]  Edward Dudewicz,et al.  The Generalized Bootstrap , 1992 .

[8]  Zdenek P. Bazant,et al.  PHYSICAL MODEL FOR STEEL CORROSION IN CONCRETE SEA STRUCTURES­ THEORY , 1979 .

[9]  K Babaei,et al.  EVALUATION OF BRIDGE DECK PROTECTIVE STRATEGIES , 1987 .

[10]  Robert E. Melchers,et al.  Life‐Cycle Performance of RC Bridges: Probabilistic Approach , 2000 .

[11]  G. Glass,et al.  The influence of chloride binding on the chloride induced corrosion risk in reinforced concrete , 2000 .

[12]  S. C. Kranc,et al.  DECREASED CORROSION INITIATION TIME OF STEEL IN CONCRETE DUE TO REINFORCING BAR OBSTRUCTION OF DIFFUSIONAL FLOW , 2002 .

[13]  Monica Prezzi,et al.  RELIABILITY APPROACH TO SERVICE LIFE PREDICTION OF CONCRETE EXPOSED TO MARINE ENVIRONMENTS , 1996 .

[14]  R Heidersbach,et al.  Mechanisms of Corrosion of Steel in Concrete , 1990 .

[15]  D. O. Northwood,et al.  Chloride ingress in concrete as measured by field exposure tests in the atmospheric, tidal and submerged zones of a tropical marine environment , 1993 .

[16]  Pd Cady Corrosion of Reinforcing Steel in Concrete—A General Overview of the Problem , 1977 .

[17]  Jr Newlon A survey to determine the impact of changes in specifications and construction practices on the performance of concrete in bridge decks. , 1974 .

[18]  John Crank,et al.  The Mathematics Of Diffusion , 1956 .

[19]  Christine M. Anderson-Cook,et al.  Probabilistic model for the chloride-induced corrosion service life of bridge decks , 2002 .

[20]  Philip D Cady,et al.  Deterioration Rates of Concrete Bridge Decks , 1984 .

[21]  Hiroshi Seki,et al.  A study of the application of reliability theory to the design of concrete cover , 1998 .

[22]  Michael R. Chernick,et al.  Bootstrap Methods: A Practitioner's Guide , 1999 .

[23]  Karl V. Bury,et al.  Statistical Distributions in Engineering: Statistics , 1999 .

[24]  G. Singh,et al.  Life-cycle studies of a concrete structure using simulation on a microcomputer , 1991 .

[25]  Hugh Hawk BRIDGIT deterioration models , 1995 .

[26]  Michael G. Fitch,et al.  DETERMINATION OF END OF FUNCTIONAL SERVICE LIFE FOR CONCRETE BRIDGE DECKS , 1995 .

[27]  Ralph E. White,et al.  Fundamental Modeling of Chloride Diffusion in Concrete , 1996 .

[28]  C. L. Page,et al.  Diffusion of chloride ions in hardened cement pastes , 1981 .

[29]  John Dalsgaard Sørensen,et al.  Optimal Planning of Maintenance of Concrete Structures , 1997 .

[30]  P. Vassie REINFORCEMENT CORROSION AND THE DURABILITY OF CONCRETE BRIDGES. , 1984 .

[31]  M M Sprinkel,et al.  CONCRETE BRIDGE PROTECTION, REPAIR, AND REHABILITATION RELATIVE TO REINFORCEMENT CORROSION: A METHODS APPLICATION MANUAL , 1993 .

[32]  G. Glass,et al.  The presentation of the chloride threshold level for corrosion of steel in concrete , 1997 .

[33]  Kenneth A. Snyder,et al.  Predicting Service Life Of Chloride-Exposed Steel-Reinforced Concrete , 1996 .

[34]  Paul C. Hoffman,et al.  Probabilistic Durability Analysis of Reinforced Concrete Bridge Decks , 1996 .

[35]  R F Stratfull,et al.  CORROSION TESTING OF BRIDGE DECKS , 1975 .

[36]  Michael M Sprinkel,et al.  ESTIMATING THE SERVICE LIFE OF EPOXY-COATED REINFORCING STEEL , 1998 .

[37]  Michael P. Enright,et al.  Service-Life Prediction of Deteriorating Concrete Bridges , 1998 .

[38]  J. F. Young,et al.  The Science and Technology of Civil Engineering Materials , 1997 .

[39]  Richard J. Kessler,et al.  Corrosion Performance of Epoxy-Coated Rebar in Florida Keys Bridges , 2001 .

[40]  Della M. Roy,et al.  Diffusion of ions through hardened cement pastes , 1981 .

[41]  R. N. Swamy,et al.  Chloride penetration into reinforced concrete slabs , 1998 .

[42]  C. Andrade,et al.  Chloride threshold values to depassivate reinforcing bars embedded in a standardized OPC mortar , 2000 .

[43]  Richard E. Weyers,et al.  MODELING THE TIME-TO-CORROSION CRACKING IN CHLORIDE CONTAMINATED REINFORCED CONCRETE STRUCTURES , 1998 .