Assessing the Yearly Impact of Wind Power Through a New Hybrid Deterministic/Stochastic Unit Commitment

This paper proposes a new unit commitment (UC) formulation for a power system with significant levels of wind generation. The proposed scheme departs from existing unit commitments in that it explicitly models the day-ahead predicted residual demand probability density function (PDF) including the effect of wind power curtailment. This PDF is then used to define a constraint on the probability of the residual demand exceeding the scheduled reserve, which is imposed in addition to the standard N-1 deterministic security criterion. This hybrid probabilistic/deterministic form maintains the mixed-integer linear structure that makes the proposed UC compatible with highly efficient commercially available solvers. Numerical examples illustrate the economical and technical benefits obtained by systematically including wind curtailment as decisions variables in the UC. In addition, the paper computes the hourly day-ahead UC schedule over the course of one year for a typical power system to illustrate the impact of wind power penetration on measures such as operation costs, incremental costs, emission levels, on/off unit switching operations, and reserve levels.

[1]  Wenyuan Li,et al.  Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .

[2]  F. Bouffard,et al.  Stochastic security for operations planning with significant wind power generation , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[3]  Michael Milligan,et al.  Modeling Utility-Scale Wind Power Plants Part 2: Capacity Credit , 2000 .

[4]  P. Sauer,et al.  Uncertainty Management in the Unit Commitment Problem , 2009, IEEE Transactions on Power Systems.

[5]  A. Conejo,et al.  Economic Valuation of Reserves in Power Systems With High Penetration of Wind Power , 2009 .

[6]  P. B. Eriksen,et al.  System operation with high wind penetration , 2005, IEEE Power and Energy Magazine.

[7]  B. Zavadil,et al.  Grid impacts of wind power: a summary of recent studies in the United States , 2003 .

[8]  Daniel S. Kirschen,et al.  Optimizing the spinning reserve requirements using a cost/benefit analysis , 2008, PES 2008.

[9]  Michael Milligan Modelling utility‐scale wind power plants. Part 1: Economics , 1999 .

[10]  D. Kirschen,et al.  A Survey of Frequency and Voltage Control Ancillary Services—Part I: Technical Features , 2007, IEEE Transactions on Power Systems.

[11]  C. Floudas Nonlinear and Mixed-Integer Optimization: Fundamentals and Applications , 1995 .

[12]  Gregor Giebel,et al.  The State-Of-The-Art in Short-Term Prediction of Wind Power. A Literature Overview , 2003 .

[13]  M. O'Malley,et al.  A new approach to quantify reserve demand in systems with significant installed wind capacity , 2005, IEEE Transactions on Power Systems.

[14]  Daniel S. Kirschen,et al.  Estimating the Spinning Reserve Requirements in Systems With Significant Wind Power Generation Penetration , 2009, IEEE Transactions on Power Systems.

[15]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[16]  A. Fabbri,et al.  Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market , 2005, IEEE Transactions on Power Systems.

[17]  W.L. Kling,et al.  Impacts of Wind Power on Thermal Generation Unit Commitment and Dispatch , 2007, IEEE Transactions on Energy Conversion.

[18]  M. Carrion,et al.  A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem , 2006, IEEE Transactions on Power Systems.

[19]  J Figueira,et al.  Stochastic Programming , 1998, J. Oper. Res. Soc..

[20]  Thomas Ackermann,et al.  International comparison of requirements for connection of wind turbines to power systems , 2005 .

[21]  L. Soder,et al.  Wind power integration in power systems with bottleneck problems , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[22]  M. O'Malley,et al.  Unit Commitment for Systems With Significant Wind Penetration , 2009, IEEE Transactions on Power Systems.