Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations
暂无分享,去创建一个
[1] Mark D. Johnston,et al. Scheduling with neural networks - the case of the hubble space telescope , 1992, Comput. Oper. Res..
[2] Mark D. Johnston,et al. An approach to rescheduling activities based on determination of priority and disruptivity , 1990 .
[3] William W. Cohen,et al. Expert systems tools for hubble space telescope observation scheduling , 1987 .
[4] Andrew Gerb. Transformation reborn: A new generation expert system for planning HST operations , 1991 .
[5] Steven Minton,et al. Solving Large-Scale Constraint-Satisfaction and Scheduling Problems Using a Heuristic Repair Method , 1990, AAAI.
[6] Glenn E. Miller,et al. A case study of Hubble Space Telescope proposal processing, planningand long-range scheduling , 1991 .
[7] Steven Minton,et al. Minimizing Conflicts: A Heuristic Repair Method for Constraint Satisfaction and Scheduling Problems , 1992, Artif. Intell..
[8] Stephen F. Smith,et al. Coordinating space telescope operations in an integrated planning and scheduling architecture , 1991, IEEE Control Systems.
[9] Mark D. Johnston,et al. A discrete stochastic neural network algorithm for constraint satisfaction problems , 1990, 1990 IJCNN International Joint Conference on Neural Networks.
[10] Mark D. Johnston,et al. Knowledge based tools for hubble space telescope planning and scheduling: constraints and strategies , 1988 .
[11] Mark D. Johnston,et al. Spike: AI scheduling for NASA's Hubble Space Telescope , 1990, Sixth Conference on Artificial Intelligence for Applications.