The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem

Abstract The PERT/CPM network techniques are based on the assumption that all needed resources will be available. The scarcity of resources is a usual reason for project delays. For the solution of the Resource Constrained Project Scheduling Problem (RCPSP) other methods have been applied. The objective of these methods consists in minimizing the project’s duration by considering both the precedence and resource constraints. Project Management software packages solve the resource conflicts using resource levelling. The paper evaluates the effectiveness of resource levelling tools of three popular packages by comparing the results when levelling two real construction projects as case studies.

[1]  Robert J Willis,et al.  Resource Constrained Scheduling within Fixed Project Durations , 1993 .

[2]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .

[3]  James H. Patterson,et al.  A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .

[4]  Pilar Tormos,et al.  Tools for resource-constrained project scheduling and control: forward and backward slack analysis , 2001, J. Oper. Res. Soc..

[5]  Alfonso Duran,et al.  Critical clouds and critical sets in resource-constrained projects , 2004 .

[6]  John Bowers,et al.  Criticality in Resource Constrained Networks , 1995 .

[7]  Tzvi Raz,et al.  Effect of resource constraints on float calculations in project networks , 1996 .

[8]  James H. Patterson,et al.  Project scheduling: The effects of problem structure on heuristic performance , 1976 .

[9]  Jerome D. Wiest Some Properties of Schedules for Large Projects with Limited Resources , 1964 .

[10]  J. D. Wiest,et al.  A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .

[11]  James H. Patterson,et al.  An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems , 1978 .

[12]  Rainer Kolisch Resource Allocation Capabilities of Commercial Project Management Software Packages , 1999, Interfaces.

[13]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[14]  María Pilar Tormos,et al.  A multicriteria heuristic method to improve resource allocation in multiproject scheduling , 2000, Eur. J. Oper. Res..

[15]  Ming Lu,et al.  RESOURCE-ACTIVITY CRITICAL-PATH METHOD FOR CONSTRUCTION PLANNING , 2003 .

[16]  Matthew J. Liberatore,et al.  PROJECT MANAGEMENT IN CONSTRUCTION: SOFTWARE USE AND RESEARCH DIRECTIONS , 2001 .

[17]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[18]  Lloyd M. Waugh Constraint knowledge for construction scheduling , 1990, Expert Planning Systems.

[19]  Pilar Tormos,et al.  The Evolution of Software Quality in Project Scheduling , 1999 .

[20]  John W. Fondahl The Development of the Construction Engineer: Past Progress and Future Problems , 1991 .

[21]  Willy Herroelen,et al.  Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment , 2005, J. Oper. Res. Soc..

[22]  R. Kolisch,et al.  Heuristic algorithms for the resource-constrained project scheduling problem: classification and computational analysis , 1999 .

[23]  Erik Demeulemeester,et al.  Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..

[24]  Jan Węglarz,et al.  Project scheduling : recent models, algorithms, and applications , 1999 .

[25]  John Bowers Multiple schedules and measures of resource constrained float , 2000, J. Oper. Res. Soc..

[26]  Pilar Tormos,et al.  Project Management: an Evaluation of Software Quality , 1994 .

[27]  Bruce M. Woodworth,et al.  Identifying the critical sequence in a resource constrained project , 1988 .