Supervision of a hybrid system based on photovoltaic arrays and supercapacitors

The minimization of the production costs and the consumption of the electricity are major stakes in the company strategy led by the specialists of the energy sector. This paper describes the research works on the supervision of a hybrid power plant. This paper deal with conceiving and in overseeing a hybrid multi sources system with Distributed Generators associating an existing photovoltaic power plant with a power plant of small multi-cogeneration hatch in order to, first, mitigate the irregularity of the photovoltaic sources, and in a second time, to participate in the ancillary service during the daily points thanks to a management and an appropriate supervision. The main objective is the optimization of the cogeneration system fuel consumption. This work solves a Unit Commitment Problem which consists to define the organization of starting / extinction of every power plant as well as its production over all the period considered to satisfy constraints at a lower cost. These constraints, besides the satisfaction of the load's demand, take into account the dynamics of every sub-system.

[1]  K. Manivannan,et al.  Neural Based Tabu Search method for solving unit commitment problem , 2002 .

[2]  Benoit Robyns,et al.  Association of PV, gas micro turbine and short term storage system to participate un frequency control , 2008 .

[3]  Gwo-Ching Liao,et al.  The use of genetic algorithm/fuzzy system and tabu search for short-term unit commitment , 2002, Proceedings. International Conference on Power System Technology.

[4]  Thierry Benoist,et al.  Relaxation lagrangienne et filtrage par coûts réduits appliqués à la production d'éléctricité. , 2005 .

[5]  M. Sydulu,et al.  New approach with Secant method for solving Unit Commitment problem , 2008, 2008 IEEE/PES Transmission and Distribution Conference and Exposition.

[6]  Puissance de Lille L2EP Association of PV , gas micro turbine and short term storage system to participate in frequency control , 2008 .

[7]  Johan Löfberg,et al.  YALMIP : a toolbox for modeling and optimization in MATLAB , 2004 .

[8]  Tomonobu Senjyu,et al.  Fast solution technique for large-scale unit commitment problem using genetic algorithm , 2003 .

[9]  P. G. Lowery,et al.  Generating Unit Commitment by Dynamic Programming , 1966 .

[10]  Hiroyuki Mori,et al.  A parallel tabu search approach to unit commitment in power systems , 1999, IEEE SMC'99 Conference Proceedings. 1999 IEEE International Conference on Systems, Man, and Cybernetics (Cat. No.99CH37028).

[11]  Chuan-Ping Cheng,et al.  Unit commitment by Lagrangian relaxation and genetic algorithms , 2000 .

[12]  Xavier Guillaud,et al.  Micro-grid powered by photovoltaic and micro turbine , 2006 .

[13]  Gwo-Ching Liao,et al.  Application meta-heuristics method for short-term unit commitment problem , 2004, IEEE PES Power Systems Conference and Exposition, 2004..