Flexible process plans: their value in flexible automation

Two man volleyball is an action game played by two players who compete against each others dexterity not only in skill and ease of using their hands, but also in their ability to employ mental quickness.

[1]  W. Ashby,et al.  An Introduction to Cybernetics , 1957 .

[2]  William S. Gere Heuristics in Job Shop Scheduling , 1966 .

[3]  Jon K. Wilbrecht,et al.  The Influence of Setup Time on Job Shop Performance , 1969 .

[4]  A. J. Clewett,et al.  Introduction to sequencing and scheduling , 1974 .

[5]  G. K. Hutchinson The Control of Flexible Manufacturing Systems: Required Information and Algorithm Structures , 1977 .

[6]  Gunter Purcheck,et al.  Multi-tool job sequencing for tool-change reduction , 1981 .

[7]  G. Rand Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .

[8]  George K. Hutchinson,et al.  The economic value of flexible automation , 1982 .

[9]  George K. Hutchinson,et al.  Production system design: A directed graph approach , 1983 .

[10]  W. E. Wilhelm,et al.  Effectiveness of alternate operations in a flexible manufacturing system , 1985 .

[11]  A. Kusiak The generalized group technology concept , 1987 .

[12]  M. Tombak,et al.  Flexibility and FMS: an empirical analysis , 1988 .

[13]  N. Kulatilaka,et al.  The Strategic Value of Flexibility: Reducing the Ability to Compromise , 1988 .

[14]  Krithi Ramamritham,et al.  Hard Real-Time Systems , 1988 .

[15]  G. Hutchinson,et al.  A quantification of the value of flexibility , 1989 .

[16]  Hong-Chao Zhang,et al.  Computer Aided Process Planning: the state-of-the-art survey , 1989 .

[17]  Percy H. Brill,et al.  On measures of flexibility in manufacturing systems , 1989 .

[18]  Yih-Long Chang,et al.  Schedule generation in a dynamic job shop , 1990 .

[19]  John E. Beasley,et al.  OR-Library: Distributing Test Problems by Electronic Mail , 1990 .

[20]  David D. Yao,et al.  Flexible Parts Routing in Manufacturing Systems , 1990 .

[21]  Steven R. Ray,et al.  ALPS: A Language for Process Specification , 1991 .

[22]  G. K. Hutchinson,et al.  Static analysis of systems: a methodology based on timed Petri nets , 1991 .

[23]  Éric D. Taillard,et al.  Benchmarks for basic scheduling problems , 1993 .