Repetitive Testing Strategies When the Testing Process is Imperfect

This paper considers the problem of test design and implementation when testing is imperfect. Items that are classified as conforming may be nonconforming, resulting in a poor outgoing quality level. Items that are classified as nonconforming may be conforming, resulting in excessive scrapping of conforming items. The failed items are commonly retested to reduce the scrapping problem. Alternatively, the accepted items may be retested to improve outgoing quality. In this paper, we examine the question of whether it is better to repetitively test rejected items, or to repetitively test accepted items. We also examine the relationship between the two testing policies, testing equipment accuracy and capacity, incoming quality, and outgoing quality requirements.

[1]  Tzvi Raz A Survey of Models for Allocating Inspection Effort in Multistage Production Systems , 1986 .

[2]  Jacob Savir AC product defect level and yield loss , 1990 .

[3]  Tzvi Raz,et al.  A Method for Sequencing Inspection Activities Subject to Errors , 1983 .

[4]  J. Doob Stochastic processes , 1953 .

[5]  Bong Jin Yum,et al.  The Optional Allocation of Inspection Effort in a Class of Nonserial Production Systems , 1981 .

[6]  Michael H. Peters,et al.  LOCATION OF QUALITY INSPECTION STATIONS: AN EXPERIMENTAL ASSESSMENT OF FIVE NORMATIVE HEURISTICS , 1984 .

[7]  Jen Tang,et al.  Design of Screening Procedures: A Review , 1994 .

[8]  Michael H. Peters,et al.  Economic Design of Quality Monitoring Efforts for Multi-Stage Production Systems , 1987 .

[9]  A. Raouf,et al.  An optimal sequence in multicharacteristics inspection , 1990 .

[10]  Tzvi Raz,et al.  Location and sequencing of imperfect inspection operations in serial multi-stage production systems , 1991 .

[11]  A. Raouf,et al.  A Cost-Minimization Model for Multicharacteristic Component Inspection , 1983 .

[12]  Betsy S. Greenberg,et al.  Repetitive testing in the presence of inspection errors , 1995 .

[13]  Tzvi Raz,et al.  Sequencing of imperfect inspection operations subject to constraints on the quality of accepted and rejected units , 1987 .

[14]  Colin G. Drury,et al.  The Two-Inspector Problem , 1986 .

[15]  Dev S. Kochhar,et al.  Multiple Inspections to Meet Desired Outgoing Quality , 1987 .

[16]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[17]  Avraham Shtub,et al.  Strategic allocation of inspection effort in a serial, multi-product production system , 1987 .

[18]  Hau L. Lee,et al.  Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .

[19]  Gary D. Eppen,et al.  Optimal Location of Inspection Stations in a Multistage Production Process , 1974 .