Application of reliability models with covariates in spare part prediction and optimization - A case study

The number of spare parts required for an item can be effectively estimated based on its reliability performance. The reliability characteristics of an item are influenced by different factors such as the operational environment, maintenance policy, operator skill, etc. However, in the majority of reliability based spare part provision studies, the effect of these influence factors has not been considered, and the only variable of interest is the operating time. The aim of this paper is to demonstrate the application of the available reliability models with covariates in the field of spare part predictions by means of a case study.

[1]  Luca Podofillini,et al.  Multiobjective spare part allocation by means of genetic algorithms and Monte Carlo simulation , 2005, Reliab. Eng. Syst. Saf..

[2]  Dragan Banjevic,et al.  Condition-based spares ordering for critical components , 2011 .

[3]  Wayne Nelson,et al.  Hazard Plotting for Incomplete Failure Data , 1969 .

[4]  Rommert Dekker,et al.  Spare parts stock control for redundant systems using reliability centered maintenance data , 2011, Reliab. Eng. Syst. Saf..

[5]  V. V. S. Sarma,et al.  Queuing Network Models for Aircraft Availability and Spares Management , 1984, IEEE Transactions on Reliability.

[6]  Yong Sun,et al.  A REVIEW ON RELIABILITY MODELS WITH COVARIATES , 2009, WCE 2010.

[7]  H. M. Taylor,et al.  An introduction to stochastic modeling , 1985 .

[8]  Jezdimir Knezevic,et al.  Availability based spare optimization using renewal process , 1998 .

[9]  Ming Jian Zuo,et al.  Modelling and optimizing sequential imperfect preventive maintenance , 2009, Reliab. Eng. Syst. Saf..

[10]  Gisela Lanza,et al.  Optimization of preventive maintenance and spare part provision for machine tools based on variable operational conditions , 2009 .

[11]  Dhananjay Kumar,et al.  Some Reliability Models for Analyzing the Effect of Operating Conditions , 1997 .

[12]  Uday Kumar,et al.  Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran , 2008, Reliab. Eng. Syst. Saf..

[13]  Behzad Ghodrati,et al.  Operating environment-based spare parts forecasting and logistics: a case study , 2005 .

[14]  E. Kaplan,et al.  Nonparametric Estimation from Incomplete Observations , 1958 .

[15]  Anwar Khalil Sheikh,et al.  Strategies in spare parts management using a reliability engineering approach , 1991 .

[16]  Mohammad Modarres,et al.  Generalized renewal process for analysis of repairable systems with limited failure experience , 2002, Reliab. Eng. Syst. Saf..

[17]  A. Mettas,et al.  Modeling and analysis of repairable systems with general repair , 2005, Annual Reliability and Maintainability Symposium, 2005. Proceedings..

[18]  Behzad Ghodrati,et al.  Weilbull and exponential renewal models in spare parts estimation : a comparison , 2006 .

[19]  John Crocker,et al.  Reliability, Maintenance and Logistic Support: - A Life Cycle Approach , 2000 .

[20]  Tore Markeset,et al.  Maintainability analysis considering time-dependent and time-independent covariates , 2011, Reliab. Eng. Syst. Saf..

[21]  Tore Markeset,et al.  A methodology for throughput capacity analysis of a production facility considering environment condition , 2011, Reliab. Eng. Syst. Saf..

[22]  S. H. A. Farrash,et al.  Simulation of an integrated age replacement and spare provisioning policy using SLAM , 1996 .

[23]  D. Cox Regression Models and Life-Tables , 1972 .

[24]  Matija Fajdiga,et al.  Generalized renewal process for repairable systems based on finite Weibull mixture , 2008, Reliab. Eng. Syst. Saf..

[25]  Bengt Klefsjö,et al.  Proportional hazards model: a review , 1994 .

[26]  Abbas Barabadi Reliability and Spare Parts Provision Considering Operational Environment: A Case Study , 2012 .

[27]  A. K. S. Jardine,et al.  Maintenance, Replacement, and Reliability , 2021 .

[28]  Uday Kumar,et al.  Reliability and operating environment‐based spare parts estimation approach: A case study in Kiruna Mine, Sweden , 2005 .