Generic kanban systems for dynamic environments

Abstract Kanbans have shown successful results in lowering inventory and shortening lead time in repetitive production systems. Unfortunately, such systems are not applicable to production environments with dynamic characteristics. Here a modified kanban system, the generic kanban system, is proposed for such dynamic environments. The generic kanban system behaves similarly to the push system except that it is more flexible with respect to system performance and more robust as to the location of the bottleneck. The simulation results that the generic kanban system is dominant over the dedicated kanban system and the CONWIP system. The adaptability of such a system to dynamic environments is justified.

[1]  Henry C. Co,et al.  A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system , 1991 .

[2]  H Ohta,et al.  The optimal operation planning of Kanban to minimize the total operation cost , 1988 .

[3]  J. A. Buzacott,et al.  Queueing models of Kanban and MRP controlled production systems , 1989 .

[4]  Bhaba R. Sarker Simulating a just-in-time production system , 1989 .

[5]  Loren Paul Rees,et al.  Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .

[6]  Jimmie Browne,et al.  Production management systems - a CIM perspective , 1988 .

[7]  Jonathan F. Bard,et al.  Determining the number of kanbans in a multiproduct, multistage production system , 1991 .

[8]  Loren Paul Rees,et al.  A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .

[9]  Bhaba R. Sarker,et al.  The performance of push and pull systems: a simulation and comparative study , 1989 .

[10]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[11]  Uday S. Karmarkar,et al.  Batching Policy in Kanban Systems , 1989 .

[12]  Osamu Kimura,et al.  Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .

[13]  Loren Paul Rees,et al.  An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans , 1987 .

[14]  Peter O'Grady,et al.  Kanban controlled pull systems: an analytic approach , 1989 .

[15]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[16]  Tae-Moon Kim Just-in-time manufacturing system: a periodic pull system , 1985 .

[17]  Loren Paul Rees,et al.  A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation , 1989 .

[18]  Loren Paul Rees,et al.  A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .

[19]  Y. Monden Toyota Production System: Practical Approach to Production Management , 1983 .

[20]  L. C. LEEj Parametric appraisal of the JIT system , 1987 .

[21]  Debasis Mitra,et al.  Analysis of a Kanban discipline for cell coordination in production lines , 1990 .

[22]  Uday S. Karmarkar Push, Pull and Hybrid Control Schemes , 1991 .

[23]  James F. Cox,et al.  An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .

[24]  Wayne J. Davis,et al.  Configuring a Kanban system using a discrete optimization of multiple stochastic responses , 1987 .

[25]  Marc Gravel,et al.  Using the Kanban in a job shop environment , 1988 .

[26]  Lee J. Krajewski,et al.  Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .

[27]  R. Schonberger Japanese Manufacturing Techniques , 1982 .

[28]  Gabriel R. Bitran,et al.  A mathematical programming approach to a deterministic Kanban system , 1987 .