Generic kanban systems for dynamic environments
暂无分享,去创建一个
[1] Henry C. Co,et al. A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system , 1991 .
[2] H Ohta,et al. The optimal operation planning of Kanban to minimize the total operation cost , 1988 .
[3] J. A. Buzacott,et al. Queueing models of Kanban and MRP controlled production systems , 1989 .
[4] Bhaba R. Sarker. Simulating a just-in-time production system , 1989 .
[5] Loren Paul Rees,et al. Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .
[6] Jimmie Browne,et al. Production management systems - a CIM perspective , 1988 .
[7] Jonathan F. Bard,et al. Determining the number of kanbans in a multiproduct, multistage production system , 1991 .
[8] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[9] Bhaba R. Sarker,et al. The performance of push and pull systems: a simulation and comparative study , 1989 .
[10] A. Alan B. Pritsker,et al. Introduction to simulation and SLAM II , 1979 .
[11] Uday S. Karmarkar,et al. Batching Policy in Kanban Systems , 1989 .
[12] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[13] Loren Paul Rees,et al. An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans , 1987 .
[14] Peter O'Grady,et al. Kanban controlled pull systems: an analytic approach , 1989 .
[15] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[16] Tae-Moon Kim. Just-in-time manufacturing system: a periodic pull system , 1985 .
[17] Loren Paul Rees,et al. A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation , 1989 .
[18] Loren Paul Rees,et al. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .
[19] Y. Monden. Toyota Production System: Practical Approach to Production Management , 1983 .
[20] L. C. LEEj. Parametric appraisal of the JIT system , 1987 .
[21] Debasis Mitra,et al. Analysis of a Kanban discipline for cell coordination in production lines , 1990 .
[22] Uday S. Karmarkar. Push, Pull and Hybrid Control Schemes , 1991 .
[23] James F. Cox,et al. An examination of just-in-time management for the small manufacturer: with an illustration , 1986 .
[24] Wayne J. Davis,et al. Configuring a Kanban system using a discrete optimization of multiple stochastic responses , 1987 .
[25] Marc Gravel,et al. Using the Kanban in a job shop environment , 1988 .
[26] Lee J. Krajewski,et al. Kanban, MRP, and Shaping the Manufacturing Environment , 1987 .
[27] R. Schonberger. Japanese Manufacturing Techniques , 1982 .
[28] Gabriel R. Bitran,et al. A mathematical programming approach to a deterministic Kanban system , 1987 .