Discussion on phase difference when plant source switching

This paper discusses operating source and reserve source used by two different voltage-grade networks. It employs MATLAB simulation system and plant source fast switch theory to establish simulation model and switch plant sources when there is a large phase difference between operating source and reserve source. With the combination of fast switch and synchronous capture switch, fast switch device can implement the plant source switch in power source connecting. Phase difference is not a decisive factor.