A demonstration of machine learning for explicit functions for cycle time prediction using MES data
暂无分享,去创建一个
[1] Shengwei Ding,et al. Queueing Theory for Semiconductor Manufacturing Systems: A Survey and Open Problems , 2007, IEEE Transactions on Automation Science and Engineering.
[2] A. A. A. Kock,et al. Effective process times for multi-server flowlines with finite buffers , 2008 .
[3] Tom Bylander,et al. Financial time series prediction and evaluation by genetic programming with trigonometric functions and high-order statistics , 2006 .
[4] John R. Koza,et al. Genetic programming - on the programming of computers by means of natural selection , 1993, Complex adaptive systems.
[5] Mark J. Willis,et al. Steady-state modelling of chemical process systems using genetic programming , 1997 .
[6] Can Birkan,et al. Evolutionary modelling of industrial systems with genetic programming , 2010 .
[7] Pei-Chann Chang,et al. Evolving CBR and data segmentation by SOM for flow time prediction in semiconductor manufacturing factory , 2009, J. Intell. Manuf..
[8] Gad Rabinowitz,et al. Cycle-Time Key Factor Identification and Prediction in Semiconductor Manufacturing Using Machine Learning and Data Mining , 2011, IEEE Transactions on Semiconductor Manufacturing.
[9] P. Backus,et al. Factory cycle-time prediction with a data-mining approach , 2006, IEEE Transactions on Semiconductor Manufacturing.
[10] J. Banks,et al. Handbook of Simulation , 1998 .
[11] Conor Ryan,et al. A Simple Powerful Constraint for Genetic Programming , 2008, EuroGP.
[12] Manoj Kumar Tiwari,et al. Data mining in manufacturing: a review based on the kind of knowledge , 2009, J. Intell. Manuf..
[13] Cathal Heavey,et al. Generating operating curves in complex systems using machine learning , 2014, Proceedings of the Winter Simulation Conference 2014.
[14] Cathal Heavey,et al. Comparison of experimental designs for simulation-based symbolic regression of manufacturing systems , 2011, Comput. Ind. Eng..
[15] Toly Chen,et al. A hybrid neural network and selective allowance approach for internal due date assignment in a wafer fabrication plant , 2008 .
[16] S. Hsu,et al. Due-date assignment in wafer fabrication using artificial neural networks , 2004 .
[17] Tsung-Che Chiang,et al. Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity , 2013, Comput. Ind. Eng..
[18] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[19] Jacobus E. Rooda,et al. Characterization of operational time variability using effective process times , 2003 .
[20] Kit Yan Chan,et al. Modeling manufacturing processes using a genetic programming-based fuzzy regression with detection of outliers , 2010, Inf. Sci..
[21] Jerry Banks,et al. Handbook of simulation - principles, methodology, advances, applications, and practice , 1998, A Wiley-Interscience publication.
[22] C P L Veeger,et al. Predicting Cycle Time Distributions for Integrated Processing Workstations: An Aggregate Modeling Approach , 2011, IEEE Transactions on Semiconductor Manufacturing.
[23] Jeroen Eggermont,et al. Data Mining using Genetic Programming : Classification and Symbolic Regression , 2005 .
[24] László Monostori,et al. AI and machine learning techniques for managing complexity, changes and uncertainties in manufacturing , 2003 .
[25] John W. Fowler,et al. Semiconductor Manufacturing Scheduling and Dispatching , 2006 .
[26] Toly Chen. A fuzzy back propagation network for output time prediction in a wafer fab , 2003, Appl. Soft Comput..
[27] Theodore B. Trafalis,et al. Real-time prediction of order flowtimes using support vector regression , 2008, Comput. Oper. Res..
[28] Adil Baykasoglu,et al. Gene expression programming based due date assignment in a simulated job shop , 2009, Expert Syst. Appl..
[29] Shu-Hsien Liao,et al. Data mining techniques and applications - A decade review from 2000 to 2011 , 2012, Expert Syst. Appl..
[30] Min Xie,et al. A systematic comparison of metamodeling techniques for simulation optimization in Decision Support Systems , 2010, Appl. Soft Comput..
[31] Madhuchhanda Dasgupta,et al. Least Absolute Deviation Estimation of Linear Econometric Models: A Literature Review , 2004 .
[32] C P L Veeger,et al. Generating Cycle Time-Throughput Curves Using Effective Process Time Based Aggregate Modeling , 2010, IEEE Transactions on Semiconductor Manufacturing.
[33] Toly Chen,et al. A fuzzy back propagation network ensemble with example classification for lot output time prediction in a wafer fab , 2009, Appl. Soft Comput..