An Evaluation Framework and Algorithms for Train Rescheduling
暂无分享,去创建一个
[1] Michael J. Marino,et al. Statistical Analysis in Preclinical Biomedical Research , 2018 .
[2] Thomas Schlechte,et al. A direct comparison of physical block occupancy versus timed block occupancy in train timetabling formulations , 2013 .
[3] Lars Lundberg,et al. A parallel algorithm for train rescheduling , 2018, Transportation Research Part C: Emerging Technologies.
[4] Leonardo Lamorgese,et al. Chapter 6: Integer Optimization Techniques for Train Dispatching in Mass Transit and Main Line , 2017 .
[5] Francesco Corman,et al. Closing the loop in real-time railway control: Framework design and impacts on operations , 2015 .
[6] Jan A. Persson,et al. N-tracked railway traffic re-scheduling during disturbances , 2007 .
[7] Dario Pacciarelli,et al. A branch and bound algorithm for scheduling trains in a railway network , 2007, Eur. J. Oper. Res..
[8] Warren Hare,et al. Best practices for comparing optimization algorithms , 2017, Optimization and Engineering.
[9] Leonardo Lamorgese,et al. Recent success stories on integrated optimization of railway systems , 2017 .
[10] Xin Yao,et al. A Survey on Problem Models and Solution Approaches to Rescheduling in Railway Networks , 2015, IEEE Transactions on Intelligent Transportation Systems.
[11] Daniele Vigo,et al. A real-time conflict solution algorithm for the train rescheduling problem , 2017 .
[12] Francesco Corman,et al. Comparing the effectiveness of two real-time train rescheduling systems in case of perturbed traffic conditions , 2008 .
[13] Francesco Corman,et al. A multi-criteria decision support methodology for real-time train scheduling , 2015, J. Rail Transp. Plan. Manag..
[14] Johanna Törnquist Krasemann. Computational decision-support for railway traffic management and associated configuration challenges: An experimental study , 2015, J. Rail Transp. Plan. Manag..
[15] Otto Anker Nielsen,et al. A Closed Form Railway Line Delay Propagation Model , 2019 .
[16] Leonardo Lamorgese,et al. An Exact Decomposition Approach for the Real-Time Train Dispatching Problem , 2015, Oper. Res..
[17] J. Arora. Chapter 18 – Multi-objective Optimum Design Concepts and Methods , 2017 .
[18] Gwo-Hshiung Tzeng,et al. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..
[19] Paul Weston,et al. A comparison of algorithms for minimising delay costs in disturbed railway traffic scenarios , 2012, J. Rail Transp. Plan. Manag..
[20] Sung-Pil Hong,et al. An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network , 2011 .
[21] Shabbir Ahmed,et al. Advances and Trends in Optimization with Engineering Applications , 2017 .
[22] Xin Yao,et al. of Birmingham Quality evaluation of solution sets in multiobjective optimisation , 2019 .
[23] Valerio De Martinis,et al. What about Train Length and Energy Efficiency of Freight Trains in Rescheduling Models , 2015 .
[24] Lucas P. Veelenturf,et al. An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .
[25] Lasse Gerrits,et al. Differences and similarities in European railway disruption management practices , 2018, J. Rail Transp. Plan. Manag..
[26] Rob M.P. Goverde,et al. Automated real-time railway traffic control: an experimental analysis of reliability, resilience and robustness , 2018 .
[27] Ulrich Weidmann,et al. A new rail optimisation model by integration of traffic management and train automation , 2016 .