Advanced hybrid scheduling system for manufacturing
暂无分享,去创建一个
The authors describe an advanced scheduling method based on a constraint-based scheduling editor and a Petri-net simulator. The advantage of this method is that the human scheduler can debug the schedule through a comprehensive Gantt chart and process chart. Backward scheduling, which is one function of the constraint-based scheduling editor, is found to be a powerful tool for due date scheduling. Computational experience indicates that the proposed approach is promising for generating and modifying a schedule, and for dynamic scheduling to respond to factory state changes.<<ETX>>
[1] M. Numao,et al. A scheduling environment for steel-making processes , 1989, [1989] Proceedings. The Fifth Conference on Artificial Intelligence Applications.
[2] T. Fukuda,et al. Scheduling Editor for Production Management with Human-Computer Cooperative Systems , 1990 .
[3] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .