Stability of Split-Level Gob-Side Entry in Ultra-Thick Coal Seams: A Case Study at Xiegou Mine
暂无分享,去创建一个
[1] C. Dowding,et al. Distinct element modeling and analysis of mining-induced subsidence , 1992 .
[2] Guorui Feng,et al. A New Gob-Side Entry Layout for Longwall Top Coal Caving , 2018 .
[3] Guo-rui Feng,et al. Interaction between vertical stress distribution within the goaf and surrounding rock mass in longwall panel systems , 2018 .
[4] Hongyun Yang,et al. Soft Roof Failure Mechanism and Supporting Method for Gob-Side Entry Retaining , 2015 .
[5] Guo-rui Feng,et al. Stress environment of entry driven along gob-side through numerical simulation incorporating the angle of break , 2020 .
[6] Jingli Zhao,et al. An Innovative Longwall Mining Technology in Tangshan Coal Mine, China , 2017 .
[7] Yunliang Tan,et al. Design and construction of entry retaining wall along a gob side under hard roof stratum , 2015 .
[8] Hai Su,et al. Study on gob-side entry retaining in fully-mechanized longwall with top-coal caving and its application , 2015 .
[9] Xuehua Li,et al. Numerical Investigation of the Effect of the Location of Critical Rock Block Fracture on Crack Evolution in a Gob-side Filling Wall , 2016, Rock Mechanics and Rock Engineering.
[10] Li Kun,et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height , 2016 .
[11] Yong Chen,et al. An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving , 2015 .