Capacity benefit margin assessment in the presence of renewable energy

[1]  Peter W. Sauer,et al.  Technical challenges of computing available transfer capability (ATC) in electric power systems , 1997, Proceedings of the Thirtieth Hawaii International Conference on System Sciences.

[2]  Mohamed Shaaban,et al.  Risk-based available transfer capability assessment including nondispatchable wind generation , 2015 .

[3]  Ismail Musirin,et al.  A Heuristic Ranking Approach on Capacity Benefit Margin Determination Using Pareto-Based Evolutionary Programming Technique , 2015, TheScientificWorldJournal.

[4]  Paul Giorsetto,et al.  Development of a New Procedure for Reliability Modeling of Wind Turbine Generators , 1983, IEEE Transactions on Power Apparatus and Systems.

[5]  A. P. Ford,et al.  Market based adequacy: reliability and CBM/ATC calculations. An independent system operator's perspective , 2002, 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309).

[6]  Alireza Mousavi,et al.  Hybrid Mutation Particle Swarm Optimisation method for Available Transfer Capability enhancement , 2012 .

[7]  R. Billinton,et al.  A simplified wind power generation model for reliability evaluation , 2006, IEEE Transactions on Energy Conversion.

[8]  K. Manivannan,et al.  Computation of Capacity Benefit Margin using Differential Evolution , 2010, Int. J. Comput. Sci. Math..

[9]  Mohd Wazir Mustafa,et al.  Available transfer capability calculation methods: A comprehensive review , 2019, International Transactions on Electrical Energy Systems.

[10]  Muhammad Naveed Aman,et al.  A Graph-Theoretic Approach to Capacity Benefit Margin Calculation for Large Multiarea Power Systems , 2020, IEEE Systems Journal.

[11]  Vladimir Kolmogorov,et al.  An Experimental Comparison of Min-Cut/Max-Flow Algorithms for Energy Minimization in Vision , 2004, IEEE Trans. Pattern Anal. Mach. Intell..

[12]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[13]  Jake D. Nunemaker,et al.  2017 Offshore Wind Technologies Market Update , 2018 .

[14]  Muyiwa S. Adaramola,et al.  Assessment of Wind Power Generation Along the Coast of Ghana , 2014 .

[15]  Dong-Min Kim,et al.  Determination of available transfer capability (ATC) considering real‐time weather conditions , 2007 .

[16]  Ahad Kazemi,et al.  A multi-stage stochastic transmission expansion planning method , 2011 .

[17]  Rong-fu Sun,et al.  Capacity benefit margin assessment based on multi-area generation reliability exponential analytic model , 2008 .

[18]  C. Singh,et al.  Determination of Capacity Benefit Margin in Multiarea Power Systems Using Particle Swarm Optimization , 2009, IEEE Transactions on Power Systems.

[19]  S.C. Savulescu A metric for quantifying the risk of blackout , 2004, IEEE PES Power Systems Conference and Exposition, 2004..

[20]  Fabien Chidanand Robert,et al.  A critical review on the utilization of storage and demand response for the implementation of renewable energy microgrids , 2018, Sustainable Cities and Society.

[21]  Taher S. Maatallah,et al.  Wind power assessment and evaluation of electricity generation in the Gulf of Tunis, Tunisia , 2013 .

[22]  Akihiko Yokoyama,et al.  Optimal CBM of tie lines between control areas in a deregulated environment , 2009 .

[23]  R. Feuillet,et al.  Allocation of available transfer capability in planning horizon , 2011 .

[24]  Muhammad Murtadha Othman,et al.  Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage , 2011 .

[25]  Majid Sanaye-Pasand,et al.  New Local Adaptive Load-shedding Methods to Mitigate Power System Blackouts , 2012 .

[26]  Chanan Singh,et al.  Capacity Benefit Margin Evaluation in Multi-area Power Systems Including Wind Power Generation Using Particle Swarm Optimization , 2010 .

[27]  Muhammad Murtadha Othman,et al.  Available transfer capability assessment using evolutionary programming based capacity benefit margin , 2006 .

[28]  Muhammad Murtadha Othman,et al.  Capacity Benefit Margin (CBM) assessment incorporating tie-line reliability , 2010, 2010 4th International Power Engineering and Optimization Conference (PEOCO).

[29]  Yong-hua Song,et al.  Development and Application of Software for ATC Calculation , 2006, 2006 International Conference on Power System Technology.

[30]  Jun Wang,et al.  Research on Effect of Renewable Energy Power Generation on Available Transfer Capability , 2013, J. Softw..

[31]  Olatunji Obalowu Mohammed,et al.  Virtual synchronous generator: an overview , 2019, Nigerian Journal of Technology.

[32]  Mohd Wazir Mustafa,et al.  A systematic approach to evaluating the influence of demand side management resources on the interarea capacity benefit margin , 2019 .