Capacity benefit margin assessment in the presence of renewable energy
暂无分享,去创建一个
Muhammad Naveed Aman | Olatunji Obalowu Mohammed | Abdulrahaman Okino Otuoze | Sani Salisu | Mohd Wazir Mustafa
[1] Peter W. Sauer,et al. Technical challenges of computing available transfer capability (ATC) in electric power systems , 1997, Proceedings of the Thirtieth Hawaii International Conference on System Sciences.
[2] Mohamed Shaaban,et al. Risk-based available transfer capability assessment including nondispatchable wind generation , 2015 .
[3] Ismail Musirin,et al. A Heuristic Ranking Approach on Capacity Benefit Margin Determination Using Pareto-Based Evolutionary Programming Technique , 2015, TheScientificWorldJournal.
[4] Paul Giorsetto,et al. Development of a New Procedure for Reliability Modeling of Wind Turbine Generators , 1983, IEEE Transactions on Power Apparatus and Systems.
[5] A. P. Ford,et al. Market based adequacy: reliability and CBM/ATC calculations. An independent system operator's perspective , 2002, 2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309).
[6] Alireza Mousavi,et al. Hybrid Mutation Particle Swarm Optimisation method for Available Transfer Capability enhancement , 2012 .
[7] R. Billinton,et al. A simplified wind power generation model for reliability evaluation , 2006, IEEE Transactions on Energy Conversion.
[8] K. Manivannan,et al. Computation of Capacity Benefit Margin using Differential Evolution , 2010, Int. J. Comput. Sci. Math..
[9] Mohd Wazir Mustafa,et al. Available transfer capability calculation methods: A comprehensive review , 2019, International Transactions on Electrical Energy Systems.
[10] Muhammad Naveed Aman,et al. A Graph-Theoretic Approach to Capacity Benefit Margin Calculation for Large Multiarea Power Systems , 2020, IEEE Systems Journal.
[11] Vladimir Kolmogorov,et al. An Experimental Comparison of Min-Cut/Max-Flow Algorithms for Energy Minimization in Vision , 2004, IEEE Trans. Pattern Anal. Mach. Intell..
[12] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.
[13] Jake D. Nunemaker,et al. 2017 Offshore Wind Technologies Market Update , 2018 .
[14] Muyiwa S. Adaramola,et al. Assessment of Wind Power Generation Along the Coast of Ghana , 2014 .
[15] Dong-Min Kim,et al. Determination of available transfer capability (ATC) considering real‐time weather conditions , 2007 .
[16] Ahad Kazemi,et al. A multi-stage stochastic transmission expansion planning method , 2011 .
[17] Rong-fu Sun,et al. Capacity benefit margin assessment based on multi-area generation reliability exponential analytic model , 2008 .
[18] C. Singh,et al. Determination of Capacity Benefit Margin in Multiarea Power Systems Using Particle Swarm Optimization , 2009, IEEE Transactions on Power Systems.
[19] S.C. Savulescu. A metric for quantifying the risk of blackout , 2004, IEEE PES Power Systems Conference and Exposition, 2004..
[20] Fabien Chidanand Robert,et al. A critical review on the utilization of storage and demand response for the implementation of renewable energy microgrids , 2018, Sustainable Cities and Society.
[21] Taher S. Maatallah,et al. Wind power assessment and evaluation of electricity generation in the Gulf of Tunis, Tunisia , 2013 .
[22] Akihiko Yokoyama,et al. Optimal CBM of tie lines between control areas in a deregulated environment , 2009 .
[23] R. Feuillet,et al. Allocation of available transfer capability in planning horizon , 2011 .
[24] Muhammad Murtadha Othman,et al. Determination of transmission reliability margin considering uncertainties of system operating condition and transmission line outage , 2011 .
[25] Majid Sanaye-Pasand,et al. New Local Adaptive Load-shedding Methods to Mitigate Power System Blackouts , 2012 .
[26] Chanan Singh,et al. Capacity Benefit Margin Evaluation in Multi-area Power Systems Including Wind Power Generation Using Particle Swarm Optimization , 2010 .
[27] Muhammad Murtadha Othman,et al. Available transfer capability assessment using evolutionary programming based capacity benefit margin , 2006 .
[28] Muhammad Murtadha Othman,et al. Capacity Benefit Margin (CBM) assessment incorporating tie-line reliability , 2010, 2010 4th International Power Engineering and Optimization Conference (PEOCO).
[29] Yong-hua Song,et al. Development and Application of Software for ATC Calculation , 2006, 2006 International Conference on Power System Technology.
[30] Jun Wang,et al. Research on Effect of Renewable Energy Power Generation on Available Transfer Capability , 2013, J. Softw..
[31] Olatunji Obalowu Mohammed,et al. Virtual synchronous generator: an overview , 2019, Nigerian Journal of Technology.
[32] Mohd Wazir Mustafa,et al. A systematic approach to evaluating the influence of demand side management resources on the interarea capacity benefit margin , 2019 .