A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan

AbstractTime overrun has detrimental effects on the performance of construction projects, especially highway projects which are associated with higher capital investment, complex stakeholder profil...

[1]  M. Tavakol,et al.  Making sense of Cronbach's alpha , 2011, International journal of medical education.

[2]  Youn Min Chou,et al.  Transforming Non-Normal Data to Normality in Statistical Process Control , 1998 .

[3]  Mohan Raj Manavazhi,et al.  Material and equipment procurement delays in highway projects in Nepal , 2002 .

[4]  Nuria Forcada,et al.  Factors Affecting Rework Costs in Construction , 2017 .

[5]  Dan Wang,et al.  Modelling risk allocation decision in construction contracts , 2007 .

[6]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[7]  Na Lu Ed.D.,et al.  Designers' and General Contractors' Perceptions of Offsite Construction Techniques in the United State Construction Industry , 2008 .

[8]  Bon-Gang Hwang,et al.  Identifying the critical factors affecting schedule performance of public housing projects , 2013 .

[9]  Hesham A. Bassioni,et al.  Causes of Delay in Building Construction Projects in Egypt , 2008 .

[10]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[11]  B P O'Connor,et al.  SPSS and SAS programs for determining the number of components using parallel analysis and Velicer’s MAP test , 2000, Behavior research methods, instruments, & computers : a journal of the Psychonomic Society, Inc.

[12]  Samuel Labi,et al.  Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays , 2012 .

[13]  Albert P.C. Chan,et al.  Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .

[14]  Viet Hung Cu,et al.  Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model , 2017 .

[15]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[16]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[17]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[18]  L. A. ZADEH,et al.  The concept of a linguistic variable and its application to approximate reasoning - I , 1975, Inf. Sci..

[19]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[20]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[21]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[22]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[23]  S. Rowlinson,et al.  Letter to the Editor , 2006 .

[24]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[25]  Víctor Yepes,et al.  Model for Systematic Innovation in Construction Companies , 2014 .

[26]  Albert P.C. Chan,et al.  Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study , 2007 .

[27]  Wynand Jacobus Van der Merwe Steyn,et al.  Causes of delay in road construction projects in Malawi , 2013 .

[28]  Irfan Anjum Manarvi,et al.  Time Extension Factors in Construction Industry of Pakistan , 2014 .

[29]  A. Chan,et al.  A fuzzy synthetic evaluation analysis of operational management critical success factors for public-private partnership infrastructure projects , 2017 .

[30]  Albert P.C. Chan,et al.  Application of Delphi method in construction engineering and management research: A quantitative perspective , 2016 .

[31]  Dongping Fang,et al.  Factor analysis-based studies on construction workplace safety management in China , 2004 .

[32]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[33]  Albert P.C. Chan,et al.  Developing a Fuzzy Risk Allocation Model for PPP Projects in China , 2010 .

[34]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[35]  Chabota Kaliba,et al.  Cost escalation and schedule delays in road construction projects in Zambia , 2009 .

[36]  R. Sadiq,et al.  Fuzzy synthetic evaluation of disinfection by-products--a risk-based indexing system. , 2004, Journal of environmental management.

[37]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .

[38]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .

[39]  Irfan Zafar,et al.  Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study , 2016 .

[40]  Keith A. Willoughby,et al.  STUDYING THE REASONS FOR DELAY AND COST OVERRUN IN CONSTRUCTION PROJECTS: THE CASE OF IRAN , 2016 .

[41]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[42]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[43]  Mohammad Hossein Fallahnejad,et al.  Delay causes in Iran gas pipeline projects , 2013 .

[44]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[45]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[46]  Jimmie Hinze,et al.  Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines , 2014 .

[47]  Mohammed Al-Khalil,et al.  Important causes of delay in public utility projects in Saudi Arabia , 1999 .

[48]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[49]  C. Amoatey,et al.  Exploring critical road project delay factors in Ghana , 2017 .

[50]  Maged Georgy,et al.  Causes of Construction Delays in Countries with High Geopolitical Risks , 2017 .

[51]  Roslina Mohammad,et al.  A Management Framework to Reduce Delays in Road Construction Projects in Sudan , 2018 .

[52]  S. Durdyev,et al.  Causes of delay in residential construction projects in Cambodia , 2017 .

[53]  Ibrahim Mahamid Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective , 2013 .

[54]  Oko John Ameh,et al.  STUDY OF RELATIONSHIP BETWEEN TIME OVERRUN AND PRODUCTIVITY ON CONSTRUCTION SITES , 2011 .

[55]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[56]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[57]  Rafiq M. Choudhry,et al.  Identification of Risk Management System in Construction Industry in Pakistan , 2013 .

[58]  Geoffrey Qiping Shen,et al.  Holistic Review and Conceptual Framework for the Drivers of Offsite Construction: A Total Interpretive Structural Modelling Approach , 2019, Buildings.

[59]  Albert P. C. Chan,et al.  Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach , 2015, Expert Syst. Appl..