Utilizing Soft Computing Methods in Analyzing Build-Operate-Transfer (BOT) Contracts
暂无分享,去创建一个
[1] Amir Hossein Alavi,et al. Prediction of principal ground-motion parameters using a hybrid method coupling artificial neural networks and simulated annealing , 2011 .
[2] Esther Malini,et al. BUILD OPERATE TRANSFER MUNICIPAL BRIDGE PROJECTS IN INDIA , 1999 .
[3] Ahmad Ayatollahi,et al. Robust genetic programming‐based detection of atrial fibrillation using RR intervals , 2011, Expert Syst. J. Knowl. Eng..
[4] Ming-Der Yang,et al. An optimization model of sewage rehabilitation , 2007 .
[5] H. Md. Azamathulla,et al. Prediction of soil erodibility factor for Peninsular Malaysia soil series using ANN , 2012, Neural Computing and Applications.
[6] A. Hassanein,et al. Financial and operational performance indicators applied to public and private water and wastewater utilities , 2007 .
[7] Simon J. T. Pollard,et al. Risk Analysis and Management in the Water Utility Sector: A Review of Drivers, Tools and Techniques , 2004 .
[8] Ian A. Cooper,et al. Investment Appraisal in the Public Sector , 1997 .
[9] S. P. Dozzi. Cost control of capital projects and the project cost management system requirements , 1996 .
[10] Alice E. Smith,et al. COST ESTIMATION PREDICTIVE MODELING: REGRESSION VERSUS NEURAL NETWORK , 1997 .
[11] Ahmed Bouferguene,et al. Artificial Neural Network Model for Cost Estimation: City of Edmonton's Water and Sewer Installation Services , 2010 .
[12] John D. Finnerty,et al. Project Financing: Asset-Based Financial Engineering , 1996 .
[13] Li yin Shen,et al. Risk Concession Model for Build/Operate/Transfer Contract Projects , 2005 .
[14] Ahmad Ayatollahi,et al. Classification of Cardiac Abnormalities Using Reduced Features of Heart Rate Variability Signal , 2009 .
[15] A. Gandomi,et al. Prediction of peak ground acceleration of Iran’s tectonic regions using a hybrid soft computing technique , 2016 .
[16] Jamshid Sodikov. COST ESTIMATION OF HIGHWAY PROJECTS IN DEVELOPING COUNTRIES: ARTIFICIAL NEURAL NETWORK APPROACH , 2005 .
[17] C. Njiru,et al. Financing Infrastructure Projects , 2002 .
[18] Paul A. Grout,et al. Public and private sector discount rates in public–private partnerships† , 2003 .
[19] Michael Klein,et al. The risk premium for evaluating public projects , 1997 .
[20] Sung Hoon An,et al. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .
[21] A. Tropsha,et al. Beware of q2! , 2002, Journal of molecular graphics & modelling.
[22] A. Akintoye,et al. The allocation of risk in PPP/PFI construction projects in the UK , 2005 .
[23] Rasa Apanavičienė,et al. CONSTRUCTION PROJECTS MANAGEMENT EFFECTIVENESS MODELLING WITH NEURAL NETWORKS , 2003 .
[24] Guomin Zhang,et al. Modelling optimal risk allocation in PPP projects using artificial neural networks , 2011 .
[25] Simon Haykin,et al. Neural Networks: A Comprehensive Foundation , 1998 .
[26] Author. Risk criticality and allocation in privatised water supply projects in Indonesia , 2011 .
[27] Roberto Todeschini,et al. The data analysis handbook , 1994, Data handling in science and technology.
[28] Peter Nordin,et al. Genetic programming - An Introduction: On the Automatic Evolution of Computer Programs and Its Applications , 1998 .
[29] A. Akintoye. PPPs for Physical Infrastructure in Developing Countries , 2009 .
[30] William B. Gartner,et al. Innovation and Entrepreneurship , 1985 .
[31] Hun Hee Cho,et al. Neural network model incorporating a genetic algorithm in estimating construction costs , 2004 .
[32] Doug Schmucker,et al. Not As Bad As It Seems: Teaching Probability And Statistics In Civil Engineering , 2004 .
[33] Jurgis Medzvieckas,et al. Superiority of artificial neural networks over statistical methods in prediction of the optimal length of rock bolts , 2012 .
[34] R. Corotis. Probability and statistics in Civil Engineering: by G.N. Smith, Nichols Publishing Company, New York, NY, 1986, 244 pp. , 1988 .
[35] A. Gandomi,et al. Nonlinear Genetic-Based Models for Prediction of Flow Number of Asphalt Mixtures , 2011 .
[36] Tahir Çelik,et al. An integrated web-based data warehouse and artificial neural networks system for unit price analysis with inflation adjustment , 2011 .
[37] Tarek Hegazy,et al. NEURAL NETWORK MODEL FOR PARAMETRIC COST ESTIMATION OF HIGHWAY PROJECTS , 1998 .
[38] Akbar A. Javadi,et al. Applications of artificial intelligence and data mining techniques in soil modeling , 2009 .
[39] Demos C. Angelides,et al. The financial risks in build‐operate‐transfer projects , 2005 .
[40] Heng Li,et al. Alternative Concession Model for Build Operate Transfer Contract Projects , 2002 .
[41] Matthew Walker. Introduction to Genetic Programming , 2001 .
[42] Amir H. Gandomi,et al. Risk analysis of BOT contracts using soft computing , 2016 .
[43] Nichael Lynn Cramer,et al. A Representation for the Adaptive Generation of Simple Sequential Programs , 1985, ICGA.
[44] Ivo Gonçalves,et al. Random Sampling Technique for Overfitting Control in Genetic Programming , 2012, EuroGP.
[45] N. Kartam,et al. Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .
[46] Aidan,et al. Engineering Project Appraisal , 2001 .
[47] M. Loosemore,et al. Risk allocation in the private provision of public infrastructure , 2007 .
[48] A. Akintoye,et al. Public Private Partnerships: Managing Risks and Opportunities , 2003 .
[49] Cândida Ferreira,et al. Automatically Defined Functions in Gene Expression Programming , 2006, Genetic Systems Programming.
[50] E. R. Yescombe. Principles of Project Finance , 2002 .
[51] Cândida Ferreira,et al. Gene Expression Programming: A New Adaptive Algorithm for Solving Problems , 2001, Complex Syst..
[52] Murat Kucukvar,et al. Cost premium prediction of certified green buildings: A neural network approach , 2011 .
[53] Yi Yang,et al. Effect of Diversification of Operation Cost on Infrastructure BOT Project Investment Decision and Analysis of Option Game , 2007 .
[54] A. Chan,et al. Identifying public‐private partnership (PPP) risks in managing water supply projects in Ghana , 2013 .
[55] Hojjat Adeli,et al. Regularization neural network for construction cost estimation , 1998 .
[56] John R. Koza,et al. Introduction to genetic programming , 1994, GECCO '07.
[57] H. Campbell,et al. Benefit-Cost Analysis: Financial and Economic Appraisal using Spreadsheets , 2003 .
[58] Federico Milani,et al. Genetic algorithm for the optimization of rubber insulated high voltage power cables production lines , 2008, Comput. Chem. Eng..
[59] Chris Hendrickson,et al. Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .
[60] Robert L. K. Tiong,et al. Automated Approach to Negotiation of BOT Contracts , 1997 .
[61] Robert M. Clark,et al. Cost models for Water supply distribution systems , 2002 .
[62] Amir Hossein Gandomi,et al. Applications of Computational Intelligence in Behavior Simulation of Concrete Materials , 2011, Computational Optimization and Applications in Engineering and Industry.
[63] Amir Hossein Alavi,et al. Towards automatic detection of atrial fibrillation: A hybrid computational approach , 2010, Comput. Biol. Medicine.
[64] Cledan Mandri-Perrott,et al. Public Private Partnerships in the Water Sector: Innovation and Financial Sustainability , 2013 .
[65] M. Moersch. Public Debt Overhangs: Advanced-Economy Episodes since 1800 , 2013 .
[66] Jingfeng Yuan,et al. The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint , 2010 .
[67] S. Ho,et al. Model for Financial Renegotiation in Public-Private Partnership Projects and Its Policy Implications: Game Theoretic View , 2006 .
[68] David Coley,et al. Introduction to Genetic Algorithms for Scientists and Engineers , 1999 .
[69] Amir Hossein Alavi,et al. A robust data mining approach for formulation of geotechnical engineering systems , 2011 .
[70] Mohammad Najafzadeh,et al. Neuro-Fuzzy GMDH to Predict the Scour Pile Groups due to Waves , 2015, J. Comput. Civ. Eng..
[71] Antonio Estache,et al. World development report 1994 : infrastructure for development , 1994 .
[72] Xin-She Yang,et al. Metaheuristic Applications in Structures and Infrastructures , 2013 .
[73] John R. Koza,et al. Genetic programming - on the programming of computers by means of natural selection , 1993, Complex adaptive systems.
[74] Mukta Paliwal,et al. Neural networks and statistical techniques: A review of applications , 2009, Expert Syst. Appl..
[75] R Weckman Gary,et al. Using Neural Networks with Limited Data to Estimate Manufacturing Cost , 2010 .
[76] S. T. Ng,et al. A simulation model for optimizing the concession period of public-private partnerships schemes , 2007 .
[77] Gabriele Milani,et al. Homogenized limit analysis of masonry structures with random input properties: polynomial Response Surface approximation and Monte Carlo simulations , 2010 .
[78] Amir Hossein Gandomi,et al. Multi-stage genetic programming: A new strategy to nonlinear system modeling , 2011, Inf. Sci..
[79] Fen-May Liou,et al. Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk , 2008 .
[80] John E. Schaufelberger,et al. ALTERNATE FINANCING STRATEGIES FOR BUILD-OPERATE-TRANSFER PROJECTS , 2003 .
[81] H. Murat Gunaydin,et al. A neural network approach for early cost estimation of structural systems of buildings , 2004 .
[82] Keith R. Molenaar,et al. Risk Assessment and Allocation for Highway Construction Management , 2006 .
[83] David Lowe,et al. Data modelling and the application of a neural network approach to the prediction of total construction costs , 2002 .
[84] David Arditi,et al. Build-Operate-Transfer in Infrastructure Projects in the United States , 2007 .
[85] Mervyn K. Lewis,et al. Accounting for Public Private Partnerships , 2002 .
[86] M. Emsley,et al. REVIEWING RISK ALLOCATION FOR INFRASTRUCTURE PFI: BETWEEN THEORY AND PRACTICE , 2012 .
[87] Tariq Shehab,et al. Cost Estimating Models for Utility Rehabilitation Projects: Neural Networks versus Regression , 2010 .
[88] Patrick T.I. Lam,et al. Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .
[89] Murat Sönmez,et al. An Artificial Neural Networks Model for the Estimation of Formwork Labour , 2011 .
[90] Sharon A. Jones,et al. Privatization of Municipal Services: Sustainability Issues of Production and Provision , 2004 .
[91] Mohan M. Kumaraswamy,et al. HONG KONG EXPERIENCE IN MANAGING BOT PROJECTS , 2001 .
[92] J. Tidd,et al. Innovation and Entrepreneurship , 2007 .
[93] H Azamathulla,et al. Estimation of Critical Velocity for Slurry Transport through Pipeline Using Adaptive Neuro-Fuzzy Interference System and Gene-Expression Programming , 2013 .
[94] Tariq Shehab,et al. Neural network cost estimating model for utility rehabilitation projects , 2013 .
[95] S. Levy. Build, Operate, Transfer: Paving the Way for Tomorrow's Infrastructure , 2008 .
[96] Amir Hossein Alavi,et al. Novel Approach to Strength Modeling of Concrete under Triaxial Compression , 2012 .
[97] M. Lewis,et al. The Governance of Contractual Relationships in PublicPrivate Partnerships , 2004 .
[98] David Arditi,et al. Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques , 2005 .
[99] Devendra K. Chaturvedi,et al. Soft Computing - Techniques and its Applications in Electrical Engineering , 2008, Studies in Computational Intelligence.
[100] Arnold C. Harberger,et al. COST-BENEFIT ANALYSIS FOR INVESTMENT , 2011 .