Determining the optimum production quantity in three-echelon production system with stochastic demand

This paper considers a three-echelon integrated production inventory model consisting of a central warehouse and a manufacturer including two independent departments as processing and assembly stages. To assemble the finished product, materials are carried to the assembly stage through two different flow channels. One group requires preprocessing in the processing stage, and the other one directly arrives from an outside supplier. Storing inventories either in a warehouse (as finished products) or in the stages (as work-in-process) and shipping them between the stages incur inventory costs that must be balanced to achieve minimum joint total cost. The central warehouse faces stochastic demand, which is assumed to be a generally distributed demand. It is controlled by continuous review (R,Q) policy. Additionally, warehouse ordering cost can be reduced through further investment. To analyze, we formulate a nonlinear cost function to aggregate all the costs. After, a simulated annealing algorithm has been suggested to solve the problem. Numerical experiments are presented to evaluate the performance and effectiveness of the proposed algorithm. Also, we use the branch and bound technique and a nonlinear optimization technique—generalized reduced gradient—for solving this problem. The experimental results show a fine performance of the proposed algorithm in comparison with two other methods.

[1]  L. Ouyang,et al.  An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .

[2]  Deng-Maw Tsai,et al.  An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments , 2010, Eur. J. Oper. Res..

[3]  M. Paknejad,et al.  Setup cost reduction in an inventory model with finite-range stochastic lead times , 1990 .

[4]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[5]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[6]  M. Paknejad,et al.  Defective units in a continuous review (s, Q) system , 1995 .

[7]  M. Ben‐Daya,et al.  An integrated inventory production system in a three-layer supply chain , 2008 .

[8]  Kit-Nam Francis Leung,et al.  A technical note on “Optimizing inventory decisions in a multi-stage multi-customer supply chain” , 2009 .

[9]  Sanjay Sharma Cycle time reduction in context to the make to order (MTO) environment , 2013 .

[10]  S. Sana,et al.  A three layer multi-item production–inventory model for multiple suppliers and retailers , 2012 .

[11]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[12]  Evan L. Porteus Investing in Reduced Setups in the EOQ Model , 1985 .

[13]  Christoph H. Glock,et al.  A multiple-vendor single-buyer integrated inventory model with a variable number of vendors , 2011, Comput. Ind. Eng..

[14]  Wen-Chuan Lee,et al.  A note on inventory model involving variable lead time with defective units for mixtures of distribution , 2004 .

[15]  Sanjay Sharma A composite model in the context of a production-inventory system , 2009, Optim. Lett..

[16]  J. C. Hayya,et al.  Setup Reduction in the Economic Production Quantity Model , 1992 .

[17]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[18]  Sanjay Sharma A modification for the carrying cost estimation with respect to the flexibility in production rate , 2008 .

[19]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[20]  I Gede Agus Widyadana,et al.  Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales , 2013 .

[21]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[22]  S. Sana,et al.  Multi-item EOQ model while demand is sales price and price break sensitive , 2012 .

[23]  Sanjay Sharma Effects concerning quality level with the increase in production rate , 2011 .

[24]  G. Gallego,et al.  The Distribution Free Newsboy Problem: Review and Extensions , 1993 .

[25]  Seyed Reza Hejazi,et al.  Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period , 2012, Comput. Ind. Eng..

[26]  Sheng-Tsaing Tseng,et al.  A Technical Note on , 2009 .

[27]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note , 2007 .

[28]  S Sharma A procedure to optimize the constrained multiple-item production system , 2007 .

[29]  Bhaba R. Sarker,et al.  Supply chain models for an assembly system with preprocessing of raw materials , 2007, Eur. J. Oper. Res..

[30]  Bhaba R. Sarker,et al.  Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..

[31]  L. Ouyang,et al.  Mixture inventory model involving variable lead time and controllable backorder rate , 2001 .

[32]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[33]  Kit-Nam Francis Leung,et al.  An integrated production-inventory system in a multi-stage multi-firm supply chain , 2010 .

[34]  Hamid Noori,et al.  Justifying new technology acquisition through its impact on the cost of running an inventory policy , 1988 .

[35]  Ilkyeong Moon,et al.  A note on lead time and distributional assumptions in continuous review inventory models , 1998, Comput. Oper. Res..

[36]  M. Khouja Optimizing inventory decisions in a multi-stage multi-customer supply chain , 2003 .

[37]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[38]  Sanjay Sharma Effects of an increase in manufacturing rate in the context of cyclic production , 2008 .