Construction of high embankment dam material flow equilibrium system

As high embankment dam engineering is often large-scale, how to achieve equilibrium of material flow is a critical factor affecting the construction progress of embankment dam engineering and an important approach to save resource and reduce construction cost. The paper establishes a material flow equilibrium system (EDMFES) that is applicable to embankment dam engineering and has traffic network assistant analysis function and presents in detail the embankment dam static flow equilibrium model. The system is applied to a Chinese national key project and the outcome demonstrates that the system is applicable to various types of Chinese high embankment dam engineerings and can provide material equilibrium scheme in accordance with basic data and requirements of the project supplied by the user.

[1]  J. Current Multiple objectives in transportation network design and routing , 1993 .

[2]  Sami M. Fereig,et al.  The role of precast concrete systems in Kuwaiti housing projects: In‐depth analysis of Kuwaiti precast concrete industry — Advantages and limitations of each system outlined , 1996 .

[3]  John R. Current,et al.  Multiobjective transportation network design and routing problems: Taxonomy and annotation , 1993 .

[4]  Wlodzimierz Ogryczak,et al.  DINAS: A computer-assisted analysis system for multiobjective transshipment problems with facility location , 1992, Comput. Oper. Res..

[5]  Torbjörn Larsson,et al.  Side constrained traffic equilibrium models: analysis, computation and applications , 1999 .

[6]  Anna Nagurney,et al.  A MULTICLASS, MULTICRITERIA TRAFFIC NETWORK EQUILIBRIUM MODEL WITH ELASTIC DEMAND , 2002 .

[7]  Mohan M. Kumaraswamy,et al.  Developing a decision support system for building project procurement , 2001 .

[8]  Hong Kam Lo,et al.  Traffic equilibrium problem with route-specific costs: formulation and algorithms , 2000 .

[9]  V. Stauskis THE EFFECT OF LOCATION OF SOUND-ABSORBING MATERIALS IN CALCULATING THE REVERBERATION TIME OF THE HALL BY DIFFERENT FORMULAS , 2003 .

[10]  Kok Lay Teo,et al.  A remark on a standard and linear vector network equilibrium problem with capacity constraints , 2008, Eur. J. Oper. Res..

[11]  Makarand Hastak,et al.  Decision model for assessment of underground pipeline rehabilitation options , 2004 .