The calculation and simulation to the subway train’s time interval
暂无分享,去创建一个
The characters of fixed block system and moving block system are introduced . Based on the concept of moving block, the way to calculate the subway trainpsilas time interval is proposed after the compare with the fixed block and quasi-moving block. The formulation for the time interval under three signals are introduced, the simulation and the analysis are done.
[1] B. H. Mao,et al. Computer simulation and modeling in railway applications , 2002 .
[2] Chris Hendrickson,et al. Applications of advanced technologies in transportation , 1998 .
[3] Mao Bao. A general purposed simulation system on train movement , 2000 .
[4] Tin Kin Ho,et al. A Simulation-Based Study for Higher Speed Trains on Busy Railway Mainlines , 2002 .