Evaluation of heuristics for inspection station allocation in serial production systems
暂无分享,去创建一个
[1] Gary D. Eppen,et al. Optimal Location of Inspection Stations in a Multistage Production Process , 1974 .
[2] L. G. Mitten,et al. Design of an Optimal Sequence of Interrelated Sampling Plans , 1964 .
[3] J. T. Ross Jackson,et al. A Dynamic Programming Application in Production Line Inspection , 1967 .
[4] E. Gerald Hurst,et al. Imperfect Inspection in a Multistage Production Process , 1973 .
[5] Sedat Sami Ercan,et al. Systems approach to the multistage manufacturing connected-unit situation , 1972 .
[6] Glenn F. Lindsay,et al. Allocation of Screening Inspection Effort---A Dynamic-Programming Approach , 1964 .
[7] Leon S. White,et al. The Analysis of a Simple Class of Multistage Inspection Plans , 1966 .
[8] Donald P. Ballou,et al. The Impact of Inspector Fallibility on the Inspection Policy in Serial Production Systems , 1982 .
[9] M. R. Garey,et al. Optimal test point selection for sequential manufacturing processes , 1972 .
[10] Michael H. Peters,et al. LOCATION OF QUALITY INSPECTION STATIONS: AN EXPERIMENTAL ASSESSMENT OF FIVE NORMATIVE HEURISTICS , 1984 .
[11] Duane Leon Dietrich. A BAYESIAN QUALITY ASSURANCE MODEL FOR A MULTI-STAGE PRODUCTION PROCESS , 1971 .