Using simulation to evaluate buffer adjustment methods in order promising
暂无分享,去创建一个
[1] Hanan Luss,et al. A due date assignment algorithm for multiproduct manufacturing facilities , 1993 .
[2] Wallace J. Hopp,et al. Quoting manufacturing due dates subject to a service level constraint , 2000 .
[3] Samuel Eilon,et al. Due dates in job shop scheduling , 1976 .
[4] Kut C. So,et al. A due-date assignment model for a flow shop with application in a lightguide cable shop , 1991 .
[5] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .
[6] J. Bertrand. The Effect of Workload Dependent Due-Dates on Job Shop Performance , 1983 .
[7] Abraham Seidmann,et al. Due date selection procedures for job-shop simulation , 1983 .
[8] T.C.E. Cheng,et al. Optimal TWK-power due-date determination and sequencing , 1987 .
[9] P. De,et al. Due‐date assignment and early/tardy scheduling on identical parallel machines , 1994 .
[10] J. Shanthikumar,et al. Approximations for the time spent in a dynamic job shop with applications to due-date assignment , 1988 .
[11] Godwin J. Udo. An investigation of due-date assignment using workload information of a dynamic shop , 1993 .
[12] T.C.E. Cheng,et al. Survey of scheduling research involving due date determination decisions , 1989 .
[13] Zhi-Long Chen,et al. Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs , 1996 .
[14] Kevin J. Dooley,et al. Mixing static and dynamic flowtime estimates for due-date assignment , 1993 .
[15] Z. K. Weng,et al. Strategies for integrating lead time and customer-order decisions , 1999 .
[16] Candace Aria Yano,et al. Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs , 1987 .
[17] James K. Weeks. A Simulation Study of Predictable Due-Dates , 1979 .
[18] Gary L. Ragatz,et al. A framework for the study of due date management in job shops , 1984 .
[19] Ali Tamer Unal,et al. A probabilistic cost-based due date assignment model for job shops , 1993 .
[20] Dean H. Kropp,et al. Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand , 1998 .
[21] T.C.E. Cheng,et al. Due-date assignment and single machine scheduling with compressible processing times , 1996 .
[22] P. De,et al. Solving a generalized model for CON due date assignment and sequencing , 1994 .
[23] W. Hopp,et al. Quoting Customer Lead Times , 1995 .
[24] T. S. Raghu,et al. Due-date setting methodologies based on simulated annealing—an experimental study in a real-life job shop , 1995 .
[25] E. L. Heard,et al. Due-Dates and Instantaneous Load in the One-Machine Shop , 1976 .
[26] T. Cheng. Integration of priority dispatching and due-date assignment in a job shop , 1988 .
[27] Hector Garcia-Molina,et al. Scheduling real-time transactions , 1988, SGMD.
[28] Hector Garcia-Molina,et al. Scheduling real-time transactions: a performance evaluation , 1988, TODS.
[29] A. Alan B. Pritsker,et al. Simulation with Visual SLAM and AweSim, 2nd Edition , 1999 .
[30] Stephen R. Lawrence,et al. Estimating flowtimes and setting due-dates in complex production systems , 1995 .
[31] Kevin J. Dooley,et al. Dynamic rules for due-date assignment , 1991 .
[32] Le Gruenwald,et al. A Logging Technique Based on Transaction Types in Real-Time Databases , 1997, RTDB.
[33] T.C.E. Cheng. Optimal due-date assignment in a job shop† , 1986 .
[34] T.C.E. Cheng. Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop , 1991 .
[35] K. R. Baker,et al. An investigation of due-date assignment rules with constrained tightness , 1981 .
[36] Le Gruenwald,et al. Effects of Deadline Propagation on Scheduling Nested Transactions in Distributed Real-Time Database Systems , 1996, Inf. Syst..
[37] Abraham Seidmann,et al. Due Date Assignment for Production Systems , 1981 .
[38] T.C.E. Cheng,et al. Due-date determination with resequencing , 1999 .
[39] P. De,et al. Optimal due-date assignment and sequencing , 1992 .
[40] Uttarayan Bagchi,et al. Due-date assignment to multi-job customer orders , 1994 .
[41] Sirirut Vanichayobon,et al. Database research at the University of Oklahoma , 1999, SGMD.
[42] Izak Duenyas,et al. Single facility due date setting with multiple customer classes , 1995 .
[43] R.-K. Li,et al. Integrating order release control with due-date assignment rules , 1997 .
[44] G. Ragatz,et al. A simulation analysis of due date assignment rules , 1984 .