A cooperative co-evolution approach for a line-seru conversion problem

The seru system is a new way of assembling products which is widely used in the electronics industry. Unlike the traditional assembly line, several small assembly units are constructed of which each is responsible for assembling an entire product. In this paper, the conversion process of assembly lines to seru systems (line-seru conversion) is studied. A cooperative co-evolution (CC) approach is proposed to solve the two sub-problems simultaneously, i.e. seru formation and seru loading. Specifically, redundant encoding is added to the encoding scheme so that serus can be adjusted during the evolutionary process as the market demands change. The computational result shows that by the adoption of coordination mechanism, CC outperforms other approaches in minimizing both total throughput time (TTPT) and total labor hours (TLH).

[1]  Ikou Kaku,et al.  A Mathematical Model for Converting Conveyor Assembly Line to Cellular Manufacturing , 2008 .

[2]  Ikou Kaku,et al.  Seru: The Organizational Extension of JIT for a Super-Talent Factory , 2012, Int. J. Strateg. Decis. Sci..

[3]  Kenneth R. Baker,et al.  Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .

[4]  Wei Sun,et al.  Combining local search into non-dominated sorting for multi-objective line-cell conversion problem , 2013, Int. J. Comput. Integr. Manuf..

[5]  Kay Chen Tan,et al.  A Competitive-Cooperative Coevolutionary Paradigm for Dynamic Multiobjective Optimization , 2009, IEEE Transactions on Evolutionary Computation.

[6]  T. Cheng Integration of priority dispatching and due-date assignment in a job shop , 1988 .

[7]  Yong Yin,et al.  The Evolution of Seru Production Systems Throughout Canon , 2008 .

[8]  John W. Fowler,et al.  A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines , 2003, Comput. Oper. Res..

[9]  Ikou Kaku,et al.  Data Mining: Concepts, Methods and Applications in Management and Engineering Design , 2011 .

[10]  Yong Yin,et al.  Training and assignment of multi-skilled workers for implementing seru production systems , 2013 .

[11]  Ikou Kaku,et al.  How to carry out assembly line–cell conversion? A discussion based on factor analysis of system performance improvements , 2012 .

[12]  Shigeji Miyazaki,et al.  Combined scheduling system for reducing job tardiness in a job shop , 1981 .

[13]  Ikou Kaku,et al.  Mathematical analysis and solutions for multi-objective line-cell conversion problem , 2014, Eur. J. Oper. Res..