Using System Dynamics Simulations to Compare Capacity Models for Production Planning

While a variety of optimization formulations of production planning problems have been proposed over the last fifty years, the majority of these are based on simple models of capacity that fail to reflect the nonlinear relationship between workload and lead times induced by the queuing behavior of capacitated production resources. We use system dynamics simulations of a simple capacitated production system to examine the performance of several different capacity models that yield load-dependent lead times, and relate these models to those used in system dynamics models of production systems

[1]  C. Holt,et al.  Derivation of a Linear Decision Rule for Production and Employment , 1956 .

[2]  L. Zurich,et al.  Operations Research in Production Planning, Scheduling, and Inventory Control , 1974 .

[3]  R. Atherton,et al.  Signature Analysis: Simulation of Inventory, Cycle Time, and Throughput Trade-Offs in Wafer Fabrication , 1986 .

[4]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[5]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[6]  Salah E. Elmaghraby Manufacturing capacity and its measurement: A critical evaluation , 1991, Comput. Oper. Res..

[7]  Robert C. Leachman,et al.  A general framework for modeling production , 1989 .

[8]  Stephen C. Graves,et al.  Safety stocks in manufacturing systems , 1987 .

[9]  Matthias Lautenschläger,et al.  Modelling lead times depending on capacity utilization , 1998 .

[10]  Uday S. Karmarkar,et al.  Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.

[11]  J. Forrester Industrial Dynamics , 1997 .

[12]  J Swanson,et al.  Business Dynamics—Systems Thinking and Modeling for a Complex World , 2002, J. Oper. Res. Soc..

[13]  P. Lendermann,et al.  Benchmarking of a stochastic production planning model in a simulation testbed , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..

[14]  S. E. Elmaghraby,et al.  The Planning and Scheduling of Production Systems , 1996 .

[15]  J. Sterman Business Dynamics , 2000 .

[16]  R. Uzsoy,et al.  Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[17]  David D. Yao,et al.  A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..

[18]  F. Hohn,et al.  Production Planning Over Time and the Nature of the Expectation and Planning Horizon , 1955 .

[19]  R. C. Leachman,et al.  A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations , 1996 .

[20]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[21]  Germán Riaño,et al.  Transient behavior of stochastic networks :application to production planning with load-dependent lead times , 2002 .

[22]  Valerie Tardif,et al.  Diagnostic scheduling in finite-capacity production environments , 1997 .

[23]  Jakob Asmundsson,et al.  Tractable Nonlinear Capacity Models for Production Planning Part I : Modelling and Formulations , 2002 .

[24]  Judith E. Dayhoff,et al.  Signature analysis of dispatch schemes in wafer fabrication , 1986 .

[25]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[26]  David L. Woodruff,et al.  Production planning with load dependent lead times , 2005, 4OR.

[27]  Stéphane Dauzère-Pérès,et al.  An Integrated Approach in Production Planning and Scheduling , 1994 .

[28]  A. Srinivasan,et al.  Resource Pricing And Aggregate Scheduling In Manufacturing Systems , 1988 .

[29]  A. A. B. Pritsker,et al.  Production scheduling using FACTOR , 1997 .

[30]  Yi-Feng Hung,et al.  A PRODUCTION PLANNING APPROACH BASED ON ITERATIONS OF LINEAR PROGRAMMING OPTIMIZATION AND FLOW TIME PREDICTION , 2001 .

[31]  John O. McClain,et al.  Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .

[32]  Brian Shorrock,et al.  Material Requirements Planning , 1978 .

[33]  Lai Peng Chan,et al.  Simulation test bed for manufacturing analysis: benchmarking of a stochastic production planning model in a simulation testbed , 2003, WSC '03.