Crane Operator Visibility of Ground Operations
暂无分享,去创建一个
[1] Tariq S. Abdelhamid,et al. Identifying Root Causes of Construction Accidents , 2001 .
[2] Yehiel Rosenfeld,et al. Automation of existing cranes: from concept to prototype , 1995 .
[3] Carlos H. Caldas,et al. Framework for Real-Time Three-Dimensional Modeling of Infrastructure , 2005 .
[4] Carlos H. Caldas,et al. Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources , 2007 .
[5] Jimmie Hinze,et al. Identifying Root Causes of Construction Injuries , 1998 .
[6] Aviad Shapira,et al. Automation of existing tower cranes : Economic and technological feasibility , 1998 .
[7] Martin Fischer,et al. Automated Generation of Work Spaces Required by Construction Activities , 2002 .
[8] Moon Kyum Kim,et al. Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction , 2009 .
[9] Frédéric Bosché,et al. Automated retrieval of 3D CAD model objects in construction range images , 2008 .
[10] Aviad Shapira,et al. Vision System for Tower Cranes , 2008 .
[11] Markus König,et al. Simulation of construction processes considering spatial constraints of crane operations , 2010 .
[12] Purdue Ect Team. CRANIUM: Device for Improving Crane Productivity and Safety , 2007 .
[13] Howard I. Shapiro,et al. Cranes and Derricks , 1980 .
[14] David V. Pizarro,et al. Auditory collision warning signals for crane operation , 1997 .
[15] Shih-Chung Kang,et al. Three-Dimensional Simulation and Visualization of Crane Assisted Construction Erection Processes , 2009 .