Optimum cut-off grade’s calculation in open pit mines with regard to reducing the undesirable environmental impacts
暂无分享,去创建一个
[1] W. Hustrulid,et al. Open Pit Mine Planning and Design , 2015 .
[2] T. Chou,et al. Effective thermoelastic constants of short-fiber composites , 1981 .
[3] Kenneth F. Lane,et al. The Economic Definition of Ore: Cut-off Grades in Theory and Practice , 1988 .
[4] Mark Kuchta,et al. Open Pit Mine Planning and Design, Two Volume Set & CD-ROM Pack , 2013 .
[5] H. Soltanmohammadi,et al. Achieving to some outranking relationships between post mining land uses through mined land suitability analysis , 2008 .
[6] Jeeng-Min Ling,et al. Economic Analysis of Wind Turbine Installation in Taiwan , 2015 .
[7] Morteza Osanloo,et al. An analytical approach with a reliable logic and a ranking policy for post-mining land-use determination , 2010 .
[8] Morteza Osanloo,et al. Deriving preference order of post-mining land-uses through MLSA framework: application of an outranking technique , 2009 .
[9] Bahram Rezai,et al. Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits , 2008 .
[10] F Rashidinezhad,et al. A PROTOTYPE HOLISTIC CUT-OFF GRADE MODEL FOR PORPHYRY COPPERS , 2007 .
[11] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[12] Gyozo Jordan,et al. Decision support methods for the environmental assessment of contamination at mining sites , 2013, Environmental Monitoring and Assessment.