Impact of Skilled and Unskilled Labor on Project Performance Using Structural Equation Modeling Approach

Construction labors play critical roles in executing the project. Therefore, the purpose of this study is to provide and review using partial least square structural equation modeling (PLS-SEM) approach that the skilled and unskilled labor force impact on project performance which has been overlooked in the previous literature in the context of the public construction industry in developing countries, like Pakistan. To achieve the objective of this study, a hypothetical model was developed and empirically examined by using Structural Equation Modeling. Data were gathered through a questionnaire survey method. In total, 400 construction practitioners responded to the questionnaire on behalf of their organization. The results revealed that unskilled labor has a significant negative impact on project performance during the construction phase, whereas the results confirmed that skilled labors have a significant positive impact on project performance in enhancing the success rate of the project in the public construction industry. These results could be used by construction experts to elaborate a broader and rooted view of the labor skills affecting the project performance. The results provide adequate information to policy and decision makers concerning labor skills being a compulsory part of the operational strategy in accelerating the better execution and success of construction projects. The current study adds to the construction project management literature by examining the effect of labor skills on project performance positively or negatively, and the hypothesized model was developed that should be adopted by practitioners to ascertain labor skills for the successful execution of the project.

[1]  Othman Mohamed,et al.  Delay Mitigation in the Malaysian Construction Industry , 2006 .

[2]  Suzanne Wilkinson,et al.  Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand , 2017 .

[3]  Marko Sarstedt,et al.  Editorial - Partial Least Squares Structural Equation Modeling: Rigorous Applications, Better Results and Higher Acceptance , 2013 .

[4]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[5]  Galit Shmueli,et al.  The elephant in the room: Predictive performance of PLS models , 2016 .

[6]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[7]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[8]  Faizan Ali,et al.  An Assessment of the Use of Partial Least Squares Structural Equation Modeling (PLS-SEM) in Hospitality Research , 2017 .

[9]  Muhammad Salman Shabbir,et al.  Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects , 2018 .

[10]  Amin Akhavan Tabassi,et al.  Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran , 2009 .

[11]  Ramudu Bhanugopan,et al.  Examining the quantitative determinants of organizational performance: evidence from China , 2015 .

[12]  Awad S. Hanna,et al.  Impact of extended overtime on construction labor productivity , 2005 .

[13]  Lajos Szabó,et al.  The relationship between success criteria and success factors in organisational event projects , 2014 .

[14]  Marko Sarstedt,et al.  Assessing the measurement invariance of the four-dimensional cultural intelligence scale across countries: A composite model approach , 2016 .

[15]  Marko Sarstedt,et al.  An assessment of the use of partial least squares structural equation modeling in marketing research , 2012 .

[16]  Gholamreza Heravi,et al.  Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity , 2015 .

[17]  Mostafa E. Shehata,et al.  Towards improving construction labor productivity and projects’ performance , 2011 .

[18]  David. Proverbs,et al.  The performance of contractors in Japan, the UK and the USA , 2002 .

[19]  Azlan Shah Ali,et al.  Office building maintenance: Cost prediction model , 2013 .

[20]  Paul M. Goodrum,et al.  Construction Craft Workers’ Perceptions of the Factors Affecting Their Productivity , 2009 .

[21]  Shamil Naoum,et al.  Factors influencing labor productivity on construction sites , 2016 .

[22]  Rudolf R. Sinkovics,et al.  The Use of Partial Least Squares Path Modeling in International Marketing , 2009 .

[23]  Paul M. Goodrum,et al.  Craft Training Issues in American Industrial and Commercial Construction , 2008 .

[24]  Marko Sarstedt,et al.  Heuristics versus statistics in discriminant validity testing: a comparison of four procedures , 2019, Internet Res..

[25]  James M.W. Wong,et al.  The changing construction labour market: a case of Hong Kong , 2006 .

[26]  P. H. Ho Labour and skill shortages in Hong Kong’s construction industry , 2016 .

[27]  M. Russo,et al.  Reducing the effects of work-family conflict on job satisfaction: the kind of commitment matters , 2013 .

[28]  Hester Lipscomb,et al.  Factors contributing to construction injury at Denver International Airport. , 2005, American journal of industrial medicine.

[29]  Abdulaziz M. Jarkas Factors influencing labour productivity in Bahrain's construction industry , 2015 .

[30]  Abdulaziz M. Jarkas,et al.  Factors Affecting Construction Labor Productivity in Kuwait , 2012 .

[31]  Murat Gunduz,et al.  Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey , 2013 .

[32]  D. Fang,et al.  Why operatives engage in unsafe work behavior: Investigating factors on construction sites , 2008 .

[33]  Paul M. Goodrum,et al.  Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance , 2017 .

[34]  Dianne Kay Slattery,et al.  Leadership Characteristics of Rising Stars in Construction Project Management , 2011 .

[35]  Andrew R. Atkinson The role of human error in construction defects , 1999 .

[36]  Kerstin Liehr-Gobbers,et al.  Evaluation of Structural Equation Models Using the Partial Least Squares (PLS) Approach , 2010 .

[37]  William F. Maloney Productivity Improvement: The Influence of Labor , 1983 .

[38]  Edward E. Rigdon,et al.  Choosing PLS path modeling as analytical method in European management research: A realist perspective , 2016 .

[39]  R. Muthuveloo,et al.  The impact of tacit knowledge management on organizational performance: Evidence from Malaysia , 2017 .

[40]  Shahid Hussain,et al.  Examining Influence of Construction Projects’ Quality Factors on Client Satisfaction Using Partial Least Squares Structural Equation Modeling , 2019, Journal of Construction Engineering and Management.

[41]  S. Knutsson,et al.  Two Scenarios for Landfills Design in Special Conditions Using the HELP Model: A Case Study in Babylon Governorate, Iraq , 2018 .

[42]  Marko Sarstedt,et al.  PLS-SEM: Indeed a Silver Bullet , 2011 .

[43]  Beliz Ozorhon,et al.  Impact of integration management on construction project management performance , 2017 .

[44]  D. Straub,et al.  Editor's comments: a critical look at the use of PLS-SEM in MIS quarterly , 2012 .

[45]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[46]  Xianhai Meng,et al.  The effect of relationship management on project performance in construction , 2012 .

[47]  Khaled Mahmoud El-Gohary,et al.  Factors Influencing Construction Labor Productivity in Egypt , 2014 .

[48]  Marko Sarstedt,et al.  Partial least squares structural equation modeling (PLS-SEM): A useful tool for family business researchers , 2014 .

[49]  Shahid Hussain,et al.  Critical Delaying Factors: Public Sector Building Projects in Gilgit-Baltistan, Pakistan , 2018 .

[50]  Peter E.D. Love,et al.  Revisiting Quality Failure Costs in Construction , 2018 .

[51]  M. Osama Jannadi,et al.  Factors affecting the safety of the construction industry , 1996 .

[52]  Paul M. Goodrum,et al.  Quantitative analysis of the impact of craft worker availability on construction project safety performance , 2016 .

[53]  Bon-Gang Hwang,et al.  Identifying the critical factors affecting schedule performance of public housing projects , 2013 .

[54]  Joseph F. Hair,et al.  When to use and how to report the results of PLS-SEM , 2019, European Business Review.