Deformation and mechanical model of temporary support sidewall in tunnel cutting partial section

[1]  Sung O. Choi,et al.  Stability analysis of a tunnel excavated in a weak rock mass and the optimal supporting system design , 2004 .

[2]  Yang Jian-min,et al.  Experimental study on bolt effect on large section shallow depth loess tunnels , 2008 .

[3]  Zhang Dingli Comparative Analysis on the Adaptability of CRD and Dual Sidewall Guide Pit for Passing through the Sand Layer of Xiamen Xiangan Seabed Tunnel , 2009 .

[4]  Chung-Sik Yoo,et al.  Performance of multi-faced tunnelling – A 3D numerical investigation , 2009 .

[5]  Zhang Jian-guo,et al.  Study of absolute deformation control criterion and its application for large section subsea tunnel with "CRD" method , 2010 .

[6]  Li Peng,et al.  Shallow depth of the tunnel excavation response research based on CRD method , 2011 .

[7]  Louis Ngai Yuen Wong,et al.  Shallow tunnelling method (STM) for subway station construction in soft ground , 2012 .

[8]  Mostafa Sharifzadeh,et al.  Design of sequential excavation method for large span urban tunnels in soft ground – Niayesh tunnel , 2013 .

[9]  Louis Ngai Yuen Wong,et al.  Structural Responses of Secondary Lining of High-Speed Railway Tunnel Excavated in Loess Ground , 2013 .

[10]  Ayub Elyasi,et al.  Numerical modeling of an umbrella arch as a pre-support system in difficult geological conditions: a case study , 2016, Bulletin of Engineering Geology and the Environment.

[11]  Hu Jun,et al.  Research on the Influence for Stability of Surrounding Rock between Two-Step Method and CRD Method , 2015, ICIEA 2015.

[12]  Peng-fei Li,et al.  Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method , 2016 .

[13]  Jianghui Dong,et al.  Deformation and mechanical characteristics of tunnel lining in tunnel intersection between subway station tunnel and construction tunnel , 2016 .