Demand Response Technology Readiness Levels for Energy Management in Blocks of Buildings

Fossil fuels deliver most of the flexibility in contemporary electricity systems. The pressing need to reduce CO2 emissions requires new methods to provide this flexibility. Demand response (DR) offers consumers a significant role in the delivery of flexibility by reducing or shifting their electricity usage during periods of stress or constraint. Blocks of buildings offer more flexibility in the timing and use of energy than single buildings, however, and a lack of relevant scalable ICT tools hampers DR in blocks of buildings. To ameliorate this problem, a current innovation project called “Demand Response in Blocks of Buildings” (DR-BoB: www.dr-bob.eu) has integrated existing technologies into a scalable cloud-based solution for DR in blocks of buildings. The degree to which the DR-BoB energy management solution can increase the ability of any given site to participate in DR is dependent upon its current energy systems, i.e., the energy metering, the telemetry and control technologies in building management systems, and the existence/capacity of local power generation and storage plants. To encourage the owners and managers of blocks of buildings to participate in DR, a method of assessing and validating the technological readiness to participate in DR energy management solutions at any given site is required. This paper describes the DR-BoB energy management solution and outlines what we have called the demand response technology readiness levels (DRTRLs) for the implementation of such a solution in blocks of buildings.

[1]  Philipp Grünewald,et al.  Demand response from the non-domestic sector: Early UK experiences and future opportunities , 2013 .

[2]  John C. Mankins,et al.  Technology readiness assessments: A retrospective , 2009 .

[3]  Zhiwei Wang,et al.  Dynamic demand control for system frequency regulation: Concept review, algorithm comparison, and future vision , 2018 .

[4]  Fuad H. Mallick Sustainable design and construction , 2014 .

[5]  A retrospective. , 2007, Ostomy/wound management.

[6]  Lingfeng Wang,et al.  Multi-party energy management for smart building cluster with PV systems using automatic demand response , 2016 .

[7]  Muneeb Dawood,et al.  Demand response in blocks of buildings: opportunities and requirements , 2017 .

[8]  N. Dawood,et al.  Load forecasting and dispatch optimisation for decentralised co-generation plant with dual energy storage , 2017 .

[9]  Nashwan Dawood,et al.  Future Demand Response Services for Blocks of Buildings , 2016, SmartGIFT.

[10]  Adam Wierman,et al.  Data center demand response: Avoiding the coincident peak via workload shifting and local generation , 2013, Perform. Evaluation.

[11]  Peng Zhao,et al.  Dynamic frequency regulation resources of commercial buildings through combined building system resources using a supervisory control methodology , 2015 .

[12]  Sairaj V. Dhople,et al.  Power Systems Without Fuel , 2015, ArXiv.

[13]  Adam Wierman,et al.  Data center demand response: avoiding the coincident peak via workload shifting and local generation , 2013, SIGMETRICS '13.

[14]  James Keirstead,et al.  London and beyond: Taking a closer look at urban energy policy , 2010 .