Continuous-Time Models for Short-Term Scheduling of Multipurpose Batch Plants: A Comparative Study
暂无分享,去创建一个
[1] Christodoulos A. Floudas,et al. Scheduling of Tanker Lightering via a Novel Continuous-Time Optimization Framework , 2003 .
[2] Christodoulos A. Floudas,et al. Enhanced Continuous-Time Unit-Specific Event-Based Formulation for Short-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies. , 2004 .
[3] David Kendrick,et al. GAMS, a user's guide , 1988, SGNM.
[4] Pedro M. Castro,et al. Comments on: An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Authors' reply , 2001 .
[5] Christodoulos A. Floudas,et al. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review , 2004, Comput. Chem. Eng..
[6] A. Barbosa‐Póvoa,et al. An Improved RTN Continuous-Time Formulation for the Short-term Scheduling of Multipurpose Batch Plants , 2001 .
[7] I. Karimi,et al. Planning and Scheduling of Parallel Semicontinuous Processes. 2. Short-Term Scheduling , 1997 .
[8] C. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 1. Multipurpose Batch Processes , 1998 .
[9] Jaime Cerdá,et al. An MILP Continuous-Time Framework for Short-Term Scheduling of Multipurpose Batch Processes Under Different Operation Strategies , 2003 .
[10] Rainer E. Burkard,et al. Makespan minimization for chemical batch processes using non-uniform time grids , 2002 .
[11] In-Beum Lee,et al. A novel nonuniform discrete time formulation for short-term scheduling of batch and continuous processes , 2001 .
[12] J. M. Pinto,et al. A Continuous Time Mixed Integer Linear Programming Model for Short Term Scheduling of Multistage Batch Plants , 1995 .
[13] Jaime Cerdá,et al. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates , 2000 .
[14] G. Schilling,et al. Optimal periodic scheduling of multipurpose plants , 1999 .
[15] Jaime Cerdá,et al. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities , 2001 .
[16] Monique Guignard-Spielberg,et al. Redefining Event Variables for Efficient Modeling of Continuous-Time Batch Processing , 2002, Ann. Oper. Res..
[17] Christodoulos A. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes , 1998 .
[18] Iftekhar A. Karimi,et al. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants , 2005 .
[19] Ignacio E. Grossmann,et al. New General Continuous-Time State−Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants , 2003 .
[20] R. Sargent,et al. The optimal operation of mixed production facilities—a general formulation and some approaches for the solution , 1996 .
[21] J. M. Pinto,et al. Optimal cyclic scheduling of multistage continuous multiproduct plants , 1994 .
[22] I. Karimi,et al. Scheduling Parallel Production Lines with Resource Constraints. 2. Decomposition Algorithm , 2002 .
[23] N. Giannelos,et al. A Simple New Continuous-Time Formulation for Short-Term Scheduling of Multipurpose Batch Processes , 2002 .
[24] Christodoulos A. Floudas,et al. Mixed Integer Linear Programming in Process Scheduling: Modeling, Algorithms, and Applications , 2005, Ann. Oper. Res..
[25] Ignacio E. Grossmann,et al. A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants , 2004, Comput. Chem. Eng..
[26] A. Barbosa‐Póvoa,et al. Simple Continuous-Time Formulation for Short-Term Scheduling of Batch and Continuous Processes , 2004 .
[27] G. Reklaitis,et al. Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization , 1997 .
[28] Christodoulos A. Floudas,et al. Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation , 2001 .
[29] C. Pantelides,et al. A simple continuous-time process scheduling formulation and a novel solution algorithm , 1996 .
[30] Christodoulos A. Floudas,et al. Effective continuous-time formulation for short-term scheduling. 3. Multiple intermediate due dates , 1999 .
[31] G. Reklaitis,et al. Continuous Time Representation Approach to Batch and Continuous Process Scheduling. 1. MINLP Formulation , 1999 .
[32] X. Zhu,et al. A Novel Continuous-Time MILP Formulation for Multipurpose Batch Plants. 1. Short-Term Scheduling , 2001 .
[33] Jaime Cerdá,et al. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities , 2000 .
[34] R.W.H. Sargent,et al. The optimal operation of mixed production facilities : extensions and improvements , 1998 .
[35] Ignacio E. Grossmann,et al. An Alternate MILP Model for Short-Term Scheduling of Batch Plants with Preordering Constraints , 1996 .
[36] Ignacio E. Grossmann,et al. A logic-based approach to scheduling problems with resource constraints , 1997 .