Short-term scheduling of electric power systems under minimum load conditions
暂无分享,去创建一个
Thermal unit operating constraints, hydro spill conditions, must-take resources and inflexible demand can all contribute to an electric power system's minimum load, or "backdown", problem's severity. We present two approaches to addressing minimum load constraints in the unit commitment problem. The first, traditional approach is to perform a unit commitment without considering the minimum load constraints, and then make the solution feasible by applying a predetermined "noneconomic" backdown order to curtail must-take resources. The second approach considers minimum load constraints as system constraints similar to operating capacity constraints, and characterizes resources to be backed as having both a decremental cost and an incremental value to the system, where these are not necessarily equal and so impact the decision to make economy sales or pump with pumped-storage resources.
[1] Luís Ferreira,et al. Short-term resource scheduling in multi-area hydrothermal power systems , 1989 .
[2] Peter B. Luh,et al. An algorithm for solving the dual problem of hydrothermal scheduling , 1998 .
[3] F. N. Lee,et al. Short-term thermal unit commitment-a new method , 1988 .
[4] A. J. Svoboda,et al. A new unit commitment method , 1997 .
[5] A. J. Svoboda,et al. Short-term resource scheduling with ramp constraints [power generation scheduling] , 1997 .