Transmission expansion planning considering maximizing penetration level of renewable sources

Recently, integration of intermittent sources into the power systems has gained most interest in distributed generation environment. Among the others, wind based generation is the most promising renewable based technology. The volatility of these sources requires the careful planning of power systems. This paper proposed a novel genetic algorithm based method to determine the optimal trade-off between wind energy spilled and transmission line investment by deciding the location of new transmission lines. By this way, power system planners can avoid over investment of transmission lines while providing maximum usage of wind turbines. The proposed method is illustrated using the IEEE 24 bus reliability test system.

[1]  A. Monticelli,et al.  Test systems and mathematical models for transmission network expansion planning , 2002 .

[2]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[3]  R. Billinton,et al.  Reliability-Based Transmission Reinforcement Planning Associated With Large-Scale Wind Farms , 2007, IEEE Transactions on Power Systems.

[4]  R. Ramakumar,et al.  Voltage profile improvement with distributed wind turbine generation-a case study , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).

[5]  M. Fotuhi-Firuzabad,et al.  Incorporating Large-Scale Distant Wind Farms in Probabilistic Transmission Expansion Planning—Part I: Theory and Algorithm , 2012, IEEE Transactions on Power Systems.

[6]  A. Zervos,et al.  Wind power development in Europe , 2001, Proc. IEEE.

[7]  G. Latorre,et al.  Classification of publications and models on transmission expansion planning , 2003 .

[8]  G. J. Anders,et al.  Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources , 2012, IEEE Transactions on Power Systems.

[9]  R. Belhomme,et al.  Evaluating and planning flexibility in sustainable power systems , 2013, 2013 IEEE Power & Energy Society General Meeting.

[10]  Singiresu S. Rao Engineering Optimization : Theory and Practice , 2010 .

[11]  Nikos D. Hatziargyriou,et al.  Transmission Expansion Planning of Systems With Increasing Wind Power Integration , 2013, IEEE Transactions on Power Systems.

[12]  Ida Fuchs,et al.  Ant colony optimization and analysis of time step resolution in transmission expansion computations for wind power integration , 2011, 2011 16th International Conference on Intelligent System Applications to Power Systems.