Decision-based process design for shortening the lead time for mold design and production
暂无分享,去创建一个
Masayuki Nakao | Shinjiro Yamada | Michiyo Kuwabara | Masato Otubo | Yotoro Hatamura | M. Nakao | S. Yamada | Michiyo Kuwabara | Masato Otubo | Yotoro Hatamura
[1] Roberto Teti,et al. Intelligent Computing Methods for Manufacturing Systems , 1997 .
[2] J. Tlusty. High-Speed Machining , 1993 .
[3] Sang-Gook Kim,et al. CIM for Mold Factory Automation , 1990 .
[4] R. Bellman. Dynamic programming. , 1957, Science.
[5] Hyung-Min Rho,et al. An Evaluation System of Order Acceptability under Consideration of Machine Loading in Die Manufacturing , 1995 .
[6] Jacques Peters,et al. Design : an integrated approach , 1990 .
[7] Firdaus E. Udwadia,et al. A Methodology for Collaborative Design Process and Conflict Analysis , 2000 .
[8] W. Eversheim,et al. A Methodology for an Integrated Design and Process Planning Based on a Concurrent Engineering Reference Model , 1995 .
[9] M. Eugene Merchant,et al. IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions , 1993 .